DSR (Demand Side Response)

3 unique locations (86 components)

Land west of Blackpit Lane, Awbridge Farm, Lower Penn, Wolverhampton, Staffordshire, WV4 4YA (4 components)
• 1,100MW electricity interconnector between GB and French transmission systems. IFA2 will use a High Voltage Direct Current (HVDC) cable for the connection between Great Britain and France. The electricity must be converted to and from HVDC and the High Voltage Alternating Current (HVAC) used in the domestic electricity transmission systems of Great Britain and France, and this requires a converter station in each country. Cables connect the converter station to a local substation, which transports the electricity onto the domestic network.
• EV charging at residential premises
• New Build Battery Storage Site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.17 MW
Cargill PLC, Trafford Park, Manchester, M17 1PA (66 components)
• Siemens SGT200 based CHP
• Solar T70 Based CHP System
• Solar T70 based CHP system
Active • 2028-29 (T-4), 2025-26 (T-4) ...
93.80 MW
ACS&T - Grimsby - Site 1, Estate Road 2, South Humberside Trading Estate, Grimsby DN31 2TG (16 components)
• Hunterston B Power Station CMU 8: [HU8-19] T_HUNB-8 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
16.52 MW