Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

4 unique locations (98 components)

Barrow Mill, Park Road, Barrow in Furness, Cumbria, LA14 4TR (24 components)

Paper Mill carrying out DSR using load turn-down.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
44.96 MW
Northfleet Mill, Crete Hall Road, Gravesend, DA11 9AD (22 components)

Paper Mill carrying out DSR using load turn-down.

Active • 2028-29 (T-4), 2025-26 (T-4) ...
33.39 MW
SMACC Melting Shop, Shepcote Lane, Europa Link, Sheffield, S9 1TZ (28 components)
• Component is a steel melting facility with electric arc-furnaces, which can be controlled to reduce their power demand when required
• DSR Component providing load turndown at a steel melting facility with electric arc furnaces
• DSR component providing load turn-down at a steel melting facility with electric arc-furnaces
Active • 2028-29 (T-4), 2027-28 (T-4) ...
141.03 MW
Waterhouse Mills, Beetham, Milnthorpe, Cumbria, LA7 7AR (24 components)

Paper products manufacturing site carrying out DSR by load turn-down

Active • 2028-29 (T-4), 2026-27 (T-4) ...
20.01 MW
Loading map...
Showing 4 locations