DSR (Demand Side Response)

9 unique locations (158 components)

WINTERS WAY HOLMER GREEN HIGH WYCOMBE BUCKINGHAMSHIRE HP15 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
17.35 MW
WINTER'S PLACE EASTLEIGH HAMPSHIRE SO50 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
17.35 MW
WINTERS FIELD TAUNTON SOMERSET TA1 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
15.18 MW
winter lane west hanney wantage OX12 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
17.35 MW
WINTER CRESCENT LYDNEY GL15 (10 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
13.01 MW
land adjacent to the FIFE GRID SERVICES FACILITY 275KV SUBSTATION, adjacent to the A876 at Kincardine, Fife, FK10 4BL. (31 components)
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• Lithium ion battery storage plant
• SolarPV generating station
Active • 2028-29 (T-4), 2026-27 (T-4) ...
134.94 MW
EDF Energy, Hinkley Point B power station, Nr Bridgwater, Somerset, TA5 1UD (56 components)
• Hinkley Point B Power Station CMU 7: [HP7-22] T_HINB-7 + (50% x T_HINB-D)
• Hinkley Point B Power Station CMU 7: [HP7-23] T_HINB-7 + (50% x T_HINB-D)
• Hinkley Point B Power Station CMU 8: [HP8-23] T_HINB-8 + (50% x T_HINB-D)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1771.09 MW
Asda Witham Highfields Road, Benfield Way Lakes Road Braintree CM7 3YS (10 components)
• CHP unit
• Load reduction.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.71 MW
1 Ratty's Lane, Hoddesdon, Hertfordshire, EN11 0RF (4 components)
• Combined Cycle Gas Turbine
• Combined Cycle Gas Turbine plant
• Gas fired reciprocating engine(s)
Active • 2028-29 (T-4), 2026-27 (T-4) ...
978.65 MW