Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

686 unique locations (8265 components) - Page 1 of 28

Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (67 components)
• A gas engine CHP site providing electricity & heat to the associated development
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• Load reduction on site supported by non-exporting standby generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Wrexham Industrial Estate Wrexham LL13 9UG (4 components)

Load reduction

Active • 2025-26 (T-4), 2020-21 (T-4) ...
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (24 components)
• 2MW gas CHP engine in a horticultural environment
• One 1.354 MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
9.85 MW
Wissington Sugar Factory British Sugar plc College Road Wissington King's Lynn PE33 9QG (33 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Existing CCGT
• The CMU is a gas fired CCGT CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
207.86 MW
William Lee - Site 5, Callywhite Lane, Dronfield, S182XU (19 components)
• Gas fired reciprocating engines
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load curtailment
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.39 MW
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (11 components)
• Load reduction on site supported by non-exporting standby generation.
• N/A
• The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 MW.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
West of Sellindge Substation, Church Lane, Sellindge, Aldington, Ashford TN25 6AF (1 component)

Load reduction on site supported by non-exporting standby generation.

Active • 2025-26 (T-4)
Welbeck Landfill Site, Boundary Lane, Normanton, Wakefield, WF6 2JA (2 components)
• Battery Storage Station
• Load reduction
Active • 2025-26 (T-4), 2022-23 (T-3)
1.35 MW
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (19 components)
• A gas engine CHP site providing hot water to a local district heating network
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• One CHP engine in a horticultural environment with no auxilliary load.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
8.14 MW
Units 1-4, 730 London Road, West Thurrock, Essex, RM20 3NL (8 components)
• 20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• DSR components to be assigned prior to the start of the Delivery Year.
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MW.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Tuscany Park Express Way WF10 5UA (5 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2025-26 (T-4), 2023-24 (T-1) ...
Tummel Power Station, Pitlochry, Perthshire, PH16 5SB (41 components)
• 1 x hydro turbine & synchronous generator
• Battery Energy Storage system operating alongside solar farm
• Solar Farm consisting of solar PV modules and inverters
Active • 2028-29 (T-4), 2027-28 (T-4) ...
104.16 MW
Tuesley Farm, Tuesley Lane, Godalming, Surrey GU7 1UG (10 components)
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
• Water Source Heat Pumps at 1748KW each (x2)
• Water source heat pumps at 1748kW each
Active • 2028-29 (T-4), 2025-26 (T-4) ...
76.97 MW
T Soanes Poultry Church Hill Road Middleton-on-the-wolds Driffield YO25 9UG (4 components)
• 2MW of DSR
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.00 MW
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (20 components)
• 1 x OCGT
• A site with two gas engine CHPs, providing hot water to a local district heating network
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2028-29 (T-4), 2026-27 (T-4) ...
9.03 MW
The Old Cricket Ground Dane Street OL12 6XT (2 components)

Load drop

Active • 2025-26 (T-4), 2021-22 (T-4)
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (24 components)
• Combined Heat and Power Plant, University of Leicester, generator's capacity 1.600MW
• Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
6.37 MW
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (48 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
32.05 MW
The Bridge Shopping Centre 11 Somers Road North PO1 1SL (11 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
37.36 MW
The Abbatoir, Brandon Rd, Watton, Thetford, IP25 6LW, United Kingdom (22 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 8MW for a 1 hour duration installed on designated land within a compound at Belvedere Nurseries
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.34 MW
Suffolk EfW Lodge Lane Great Blakenham Ipswich, Suffolk IP6 0JE (16 components)
• Energy facility comprising of reciprocating engine sets.
• Existing Energy from Waste Plant
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
64.04 MW
Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (12 components)
• Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH.
• Load curtailment
Active • 2025-26 (T-4), 2023-24 (T-4) ...
2.13 MW
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (60 components)
• Staythorpe 1 - CCGT MSID: 7210
• Staythorpe 2 - CCGT MSID: 7210
• Staythorpe 4 - CCGT MSID: 7210
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6050.24 MW
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (11 components)
• A gas engine CHP site providing hot water to a local district heating network
• Bus depot site
• Load reduction
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.59 MW
Stamfordham Road Westerhope, Newcastle, NE52LD (5 components)

Load curtailment

Active • 2025-26 (T-4), 2023-24 (T-1) ...
Loading map...
Showing 25 locations