Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

26 unique locations (125 components) - Page 1 of 2

AL6 (51 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.23 MW
BRISTOL WASTE WATER TREATMENT WORKS, KINGS WESTON LANE, BRISTOL, BS11 0YS (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
DAWDON SEWAGE PUMPING STN, SEAHAM, NON PAF ADDRESS, SEAHAM BATHING WATER SCHEME, SR7 7 (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
Heathlands Farm, Honey Hill, Wokingham, RG40 3BG (12 components)
• Water source Heat Pumps at 1883KW each
• Water source Heat Pumps at 1883KW each - located at Horticultural site
• Water source heat pump at 1883kW each
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Holly Water Close, Torquay, TQ1 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
LAYER WATER WORKS - CAIRNS WAY FDR, CHURCH ROAD, LAYER DE LA HAYE, COLCHESTER, CO2 0LA (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
LEVENMOUTH WASTE WATER TREATMENT WORKS, 2, ELM PARK, METHILHAVEN ROAD, METHIL, LEVEN, FIFE, KY8 3WA (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
MEADOWHEAD WATER TREATMENT WORKS, MEADOWHEAD ROAD, IRVINE, KA11 5AY (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
NORTHUMBRIAN WATER, BLACKWELL PUMPING STATION, CROFT ROAD,DARLINGTON, DL2 2SD (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
NORTHUMBRIAN WATER, OVINGHAM PUMPS, FEEDER 2, NON PAF N, OVINGHAM, PRUDHOE, NORTHUMBERLAND, NE42 6HL (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
Sheeplands Farm, Twyford, Wargrave, Reading RG10 8DJ (8 components)

Water source heat pumps at 1748kW each

Active • 2028-29 (T-4), 2025-26 (T-4) ...
SWANAGE WASTE WATER, TREATMENT WORKS, NR. MARINE VILLAS, HIGH STREET, SWANAGE, DORSET, BH19 2AP (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
Tuesley Farm, Tuesley Lane, Godalming, Surrey GU7 1UG (10 components)
• Water Source Heat Pumps at 1748KW each (x2)
• Water source heat pumps at 1748kW each
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Water Lane, Tiverton, Devon, EX16 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Water Park Road, Bideford, Devon, EX39 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
WATER PUMPING STATION, MIDDLEMEAD, WEST HANNINGFIELD, CHELMSFORD, CM3 8HS (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
WATER PUMPING STATION, MIDDLEMEAD, WEST HANNINGFIELD, CHELMSFORD, CM3 8HS (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
Waters Edge Close, Whitehaven, Cumbria, CA28 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
WATER TREATMENT WORKS, WARKWORTH, MORPETH, NE65 0UB (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
WATER TREATMENT WORKS, WESSEX WATER LIMI, SUTTON BINGHAM, YEOVIL, SOMERSET, BA22 9QL (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
WESSEX WATER P/S, BUSHES ROAD, BLANDFORD, DT11 8US (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
Loading map...
Showing 25 locations