4 unique locations (117 components)

Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (45 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU is a combined cycle gas turbine
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2527.80 MW
Land north of Radstock Road, Midsomer Enterprise Park, Radstock Road, Midsomer Norton, Radstock, BA3 2AF (10 components)
• Existing CMU comprising of battery storage and associated plant
• Load reduction upon instruction
• New Build CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-1) ...
13.88 MW
Ketton Works, Stamford, PE9 3SX (5 components)
• Hanson site - Is Load Reduction/ Turn Down
• Proven reduction of site consumption
Active • 2025-26 (T-1), 2022-23 (T-4) ...
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (57 components)
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.92 MW
Loading map...