Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

2511 unique locations (51299 components) - Page 1 of 101

11 BURSOM ROAD, LEICESTER, LE4 1BS (1 component)

2.52MW Battery Storage located at PepsiCo Leicester factory

Active • 2024-25 (T-4)
0.54 MW
160 Corporation Road, Newport, Gwent, NP19 0WF (14 components)
• 0.39MW Battery Storage located at Newport Bus depot (2)
• Bus depot site
Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.39 MW
1 Waterfront Avenue, Edinburgh, EH5 1SG (26 components)

Office site with behind the meter generation (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
14.71 MW
2600 John Smith Drive, Oxford, OX4 2JY (37 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
2 Bar Lane, York, YO51 9LS (85 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
45.41 MW
2 Ford St, Coventry CV1 5WT (8 components)

1.2MW Battery Storage located at National Express Coventry (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
3.65 MW
36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PG (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
0.32 MW
AB10 (9 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-4), 2024-25 (T-1)
0.04 MW
AB11 (5 components)

Domestic EV charger (2)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
0.01 MW
AB12 (88 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2027-28 (T-4), 2025-26 (T-4) ...
54.45 MW
AB14 (9 components)
• Domestic EV charger (2)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
AB15 (67 components)
• Domestic EV
• Domestic EV charge point
• Domestic demand turn down
DSR EV Charging Rejected AB15
Active • 2027-28 (T-4), 2025-26 (T-4) ...
270.71 MW
AB21 (19 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.04 MW
AB22 (6 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.04 MW
AB25 (5 components)

Domestic EV charger (2)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
AB30 (11 components)
• Domestic EV charger (2)
• Domestic demand turn down
Active • 2025-26 (T-4), 2024-25 (T-4) ...
0.04 MW
AB31 (52 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
DSR EV Charging Rejected AB31
Active • 2027-28 (T-4), 2025-26 (T-4) ...
136.45 MW
AB32 (23 components)
• Domestic demand turn down (2)
• Domestic EV charger
DSR EV Charging Rejected AB32
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
AB33 (13 components)
• Domestic EV charger (2)
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.04 MW
AB34 (8 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.03 MW
AB35 (4 components)
• Domestic EV charger (2)
• Domestic EV
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.00 MW
AB38 (3 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2024-25 (T-4) ...
0.04 MW
AB39 (17 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.05 MW
AB41 (46 components)
• Domestic EV
• Domestic EV charge point
• Domestic demand turn down
DSR EV Charging Rejected AB41
Active • 2027-28 (T-4), 2025-26 (T-4) ...
165.45 MW
AB42 (111 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
84.91 MW
Loading map...
Showing 25 locations