DSR (Demand Side Response)

3 unique locations (62 components)

Yardley Wood Bus Depot, Yardley Wood Rd, Yardley Wood, Birmingham, B14 4BN (14 components)
• 0.52 MW Battery Storage located at National Express Yardley Wood.
• 0.52MW Battery Storage located at National Express Yardley Wood
• 5 MW of demand reduction
Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.41 MW
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (19 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S24S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT and Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• Keadby GT3
Active • 2028-29 (T-4), 2026-27 (T-4) ...
132.13 MW
Burghfield Mini Power Plant, Cottage Lane, Pingewood, Reading, RG30 3UW (29 components)
• 1 x OCGT
• Commercial printers
• New reciprocating gensets in acoustic enclosure
Active • 2028-29 (T-4), 2027-28 (T-4) ...
577.46 MW
Loading map...
Showing 3 locations