DSR (Demand Side Response)

11 unique locations (134 components)

Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (10 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2025-26 (T-4), 2024-25 (T-4) ...
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (6 components)
• 0.500MW Battery Energy Storage System
• 0.5MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Plot B at Severn Road Avonmouth BS10 7SE (13 components)
• 10.000MW DSR
• 15.000MW of Battery Energy Storage Systems
• 15MW of Battery Energy Storage Systems
• ... and 2 more unique descriptions
Active • 2025-26 (T-4), 2025-26 (T-1) ...
1.36 MW
PL14 (19 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
Norbord Morayhill Dalcross Inverness IV2 7JQ (6 components)
• 4.000MW of demand reduction
• 4MW of demand reduction
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Norbord Cowie Station Road Cowie Stirling FK7 7BQ (9 components)
• 3.600MW of demand reduction
• 3.6MW of demand reduction
• 5MW of demand reduction
Active • 2026-27 (T-4), 2025-26 (T-4) ...
G66 (45 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.59 MW
FORD STREET NORTH - BUS DEPOT 2 FORD STREET COVENTRY CV1 5WT (6 components)
• 1.500MW Demand reduction at Coventry Bus Depot
• bus depot site
Active • 2027-28 (T-4), 2024-25 (T-4) ...
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (10 components)
• 0.250MW Battery Energy Storage System
• 0.25MW of Demand Reduction
• 5MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (9 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Active • 2025-26 (T-4), 2024-25 (T-4) ...
11 BURSOM ROAD, LEICESTER, LE4 1BS (1 component)

2.52MW Battery Storage located at PepsiCo Leicester factory

Active • 2024-25 (T-4)
0.54 MW
Loading map...
Showing 11 locations