Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

16 unique locations (490 components)

B77 (56 components)
β€’ Domestic EV charge point
β€’ Domestic EV charger
β€’ Domestic demand turn down
Active β€’ 2027-28 (T-4), 2025-26 (T-1) ...
184.01 MW
Bush Estate, Penicuik EH26 0QA (11 components)
β€’ Load reduction on site supported by standby generation
β€’ Standby generation reducing load
Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
3.89 MW
Chatterley Close, ST5 8LE (3 components)

Load reduction on site supported by non-exporting standby generation.

Active β€’ 2024-25 (T-4), 2022-23 (T-4)
3.57 MW
Coldstore 5, 1B Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (13 components)
β€’ Load drop
β€’ Load reduction on flexible electricity consuming processes
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
2.38 MW
GU6 (38 components)
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
β€’ Domestic demand turn down
Active β€’ 2027-28 (T-4), 2025-26 (T-1) ...
77.38 MW
Harrier Park, Hawksworth, Didcot, Oxfordshire, OX11 7PL (45 components)

load curtailment at site

Active β€’ 2028-29 (T-4), 2024-25 (T-4) ...
11.07 MW
M21 (24 components)
β€’ Domestic EV
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active β€’ 2025-26 (T-1), 2025-26 (T-4) ...
57.80 MW
MytheΒ Road. Tewkesbury. Gloucester. GL20 6AA (17 components)

Load reduction on site supported by non-exporting standby generation.

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
7.15 MW
NE43 (8 components)
β€’ Domestic EV charger
β€’ Domestic demand turn down
Active β€’ 2025-26 (T-4), 2024-25 (T-1) ...
14.16 MW
NG23 (54 components)
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
β€’ Domestic demand turn down
Active β€’ 2027-28 (T-4), 2025-26 (T-1) ...
124.81 MW
NR14 (79 components)
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
β€’ Domestic demand turn down
Active β€’ 2025-26 (T-1), 2025-26 (T-4) ...
187.14 MW
PR7 (51 components)
β€’ Domestic EV
β€’ Domestic EV charge point
β€’ Domestic EV charger
Active β€’ 2025-26 (T-1), 2025-26 (T-4) ...
117.33 MW
RH2 (50 components)
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
β€’ Domestic demand turn down
Active β€’ 2027-28 (T-4), 2025-26 (T-1) ...
185.54 MW
Scunthorpe Cold Store, Cupola Way, Scunthorpe DN15 9YJ (13 components)
β€’ Load drop
β€’ Load reduction on flexible electricity consuming processes
Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
4.73 MW
TN28 (13 components)
β€’ Domestic EV charger
β€’ Domestic demand turn down
Active β€’ 2027-28 (T-4), 2025-26 (T-1) ...
28.21 MW
YO43 (15 components)
β€’ Domestic EV charge point
β€’ Domestic EV charger
Active β€’ 2025-26 (T-1), 2025-26 (T-4) ...
94.19 MW
Loading map...
Showing 16 locations