Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

21 unique locations (53 components)

WESSEX WATER P/S, BUSHES ROAD, BLANDFORD, DT11 8US (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
28.00 MW
WATER TREATMENT WORKS, WARKWORTH, MORPETH, NE65 0UB (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
28.00 MW
WATER PUMP STATION, HIGH ROAD, ASHTON KEYNES, SWINDON, SN6 6NX (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1)
14.00 MW
WATER PUMPING STATION, MIDDLEMEAD, WEST HANNINGFIELD, CHELMSFORD, CM3 8HS (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
28.00 MW
WATER PUMPING STATION, MIDDLEMEAD, WEST HANNINGFIELD, CHELMSFORD, CM3 8HS (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
28.00 MW
28.00 MW
SWANAGE WASTE WATER, TREATMENT WORKS, NR. MARINE VILLAS, HIGH STREET, SWANAGE, DORSET, BH19 2AP (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
28.00 MW
Staines Raw Water PS, Birch Green, , Staines, United Kingdom, TW18 4HA (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
42.00 MW
PORTRACK SEWAGE PUMPING STATION, PORTRACK LANE, STOCKTON-ON-TEES, NON PAF N, NORTHUMBRIAN WATER LTD, TS18 2AN (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
28.00 MW
MEADOWHEAD WATER TREATMENT WORKS, MEADOWHEAD ROAD, IRVINE, KA11 5AY (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
28.00 MW
Lockwood Shaft Raw Water, Ferry Lane, Waltham Forest, London, United Kingdom, N17 9NF (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
28.00 MW
Littleton Raw Water PS, Ashford Road, , Staines, United Kingdom, TW18 1RU (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
28.00 MW
LEVENMOUTH WASTE WATER TREATMENT WORKS, 2, ELM PARK, METHILHAVEN ROAD, METHIL, LEVEN, FIFE, KY8 3WA (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
28.00 MW
LEVELS SEWAGE TREATMENT WORKS, WESSEX WATER LIMITED, ACCOMODATION ROAD, BLEADON, WESTON SUPER MARE, BS24 0AP (3 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
14.00 MW
LAYER WATER WORKS - CAIRNS WAY FDR, CHURCH ROAD, LAYER DE LA HAYE, COLCHESTER, CO2 0LA (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
28.00 MW
DAWDON SEWAGE PUMPING STN, SEAHAM, NON PAF ADDRESS, SEAHAM BATHING WATER SCHEME, SR7 7 (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
28.00 MW
Datchet 2 Raw Water PS, Horton Road, Datchet, Slough, United Kingdom, SL3 9HX (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
28.00 MW
Chingford South Raw Water PS, Lea Valley Road, Enfield, London, United Kingdom, E4 7PX (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
28.00 MW
Boots Store, NE42 6HL (3 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
14.00 MW
Boots Store, CM9 6QA (3 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
14.00 MW
Boots Store, BS11 0YS (3 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
14.00 MW
Loading map...
Showing 21 locations