DSR (Demand Side Response)

13 unique locations (564 components)

111 Brancroft Way Enfield Middlesex EN3 7PL (12 components)
โ€ข Enfield CCGT Power Station - (one unit station)
โ€ข Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd Reservoir. The plant is restricted to the quantity of water it can use as minimum water levels must be maintained in the resevoir. The plant has a connection capacity of 35300kVA and an associated power factor of 0.85.
โ€ข N/A
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
403.07 MW
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (90 components)
โ€ข E1000 CHP
โ€ข Existing CCGT
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active โ€ข 2026-27 (T-4), 2024-25 (T-4) ...
2435.45 MW
ACS&T - Grimsby - Site 2, Estate Road 2, South Humberside Trading Estate, Grimsby DN31 2TG (17 components)
โ€ข Grain B CCGT Unit 8 CHP element is via supply of heat to Grain LNG regasification facility
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข The CMU is composed of two CHPs (ECOMAXยฎ 15 NGS) with an electrical output capacity of 1.501 MWe each. The CMU will supply electricty on site to METTIS AEROSPACE LIMITED.
Active โ€ข 2028-29 (T-4), 2025-26 (T-4) ...
22.34 MW
ACS&T - Wolverhampton - Site 2, ACS&T Logistics, Park Lane ,ย Wolverhampton, WV10 9QD (30 components)
โ€ข Gas fired reciprocating engines.
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 MW.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
43.30 MW
Barrow Man Road Birchington Kent CT7 0AX (13 components)
โ€ข Load curtailment
โ€ข Syngenta - CHP unit
โ€ข Two CHP engines in horticultural environment with no auxilliary load
Active โ€ข 2028-29 (T-4), 2025-26 (T-4) ...
10.22 MW
Component has yet to beย procurred (226 components)
โ€ข Component has yet to beย procurred
โ€ข District heating implementation with one asset 1MW and no auxiliary load
โ€ข Poole Existing Site CHP
Active โ€ข 2027-28 (T-4), 2026-27 (T-4) ...
1238.88 MW
Cwm Rheidol Aberystywth, Ceredigion SY23 3NF Aberystwyth (34 components)
โ€ข An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass burn technology which is the most proven Energy from Waste technology currently available. The process will consist of the delivery of waste to the Facility by truck where it will be deposited in a storage bunker, from which it will be fed into two thermal units. Each unit will consist of a moving grate, boiler and air pollution control equipment. The steam generated will drive a turbine for the generation of electricity.
โ€ข The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Cwm Rheidol Power Station (being one out of two) which is supplied by water from the Dinas Reservoir.
โ€ข The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Dinas Power Station, which is supplied by water from the Nant-y-Moch reservoir.
Active โ€ข 2028-29 (T-4), 2026-27 (T-4) ...
151.50 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
โ€ข BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
โ€ข BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
โ€ข BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
1613.68 MW
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (17 components)
โ€ข A new build 49.5MW battery energy storage system
โ€ข A new build battery energy storage system
โ€ข Connah's Quay PS Unit 1 CCGT
Active โ€ข 2026-27 (T-4), 2025-26 (T-4) ...
156.98 MW
LAND ON THE NORTH SIDE OF DESFORD ROAD, ENDERBY, LEICESTER, LE19 3LR (18 components)
โ€ข Battery Storage Plant
โ€ข Small gas fired OCGT.
โ€ข The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active โ€ข 2026-27 (T-4), 2025-26 (T-4) ...
98.37 MW
QMC Campus, Nottingham University Hospitals, Queens Medical Centre, Derby Road, Nottingham, NG7 2UH (17 components)
โ€ข 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
โ€ข A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active โ€ข 2027-28 (T-4), 2025-26 (T-4) ...
14.85 MW
Rougham Industrial Estate, Horizon House, Fred Castle Way, Bury St Edmunds, Rougham IP30 9ND, United Kingdom (13 components)
โ€ข Grain B CCGT Unit 6 CHP element is via supply of heat to Grain LNG regasification facility
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
24.00 MW
Walton-on-Thames WTW, Hurst Road, , Walton-on-Thames, United Kingdom, KT12 2EG (4 components)
โ€ข Grain B CCGT Unit 8 CHP element is via supply of heat to Grain LNG regasification facility
โ€ข The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active โ€ข 2025-26 (T-4), 2024-25 (T-1) ...
4.09 MW