Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

7 unique locations (135 components)

West Marsh Road, Spalding, Lincolnshire, PE11 2BB (6 components)
• A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. Each turbine is individually metered with output being the total of all three turbines net of any auxillary load.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• This is a long standing existing CHP unit located on land within a manufacturing site.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
1180.44 MW
Runcorn Site HQ, South Parade, PO Box9, Runcorn, Cheshire, WA7 4LT (16 components)
• 1MW / 1.15 MWH Battery Energy Storage System
• CMU INO200 represents demand assets on the Inovyn ChlorVinyls Ltd site in Runcorn, Cheshire. The asset uses electricity for Chemical manufacture. Site load can easily be altered to suit demand or reduction.
• District heating implementation with one asset 1MW and no auxiliary load
Active • 2028-29 (T-4), 2026-27 (T-4) ...
113.33 MW
Land at Crown Farm, King John Bank, Walpole St. Andrew, Wisbech, Norfolk, PE13 5PR (16 components)
• Gas fuelled generation plant
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to TS16_1, cloned to TS17_1 and then cloned to TS18_1
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Fasnakyle Power Station, Cannich, Beauly, IV4 7NB (10 components)
• Generating Unit 1
• Generating Unit 2
• Generating unit 3.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
104.92 MW
Errochty Power Station, Tummel Bridge, by Pitlochry, Perthshire, PH16 5DF (23 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• N/A
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2027-28 (T-4), 2023-24 (T-4) ...
Energy Hub, Corner of Rodney Road and Heygate Street, London, SE17 1FJ (18 components)
• A site with two gas engine CHPs providing hot water to a local district heating network
• A site with two gas engine CHPs, providing hot water to a local district heating network
• CMU INO200 represents demand assets on the Inovyn ChlorVinyls Ltd site in Runcorn, Cheshire. The asset uses electricity for Chemical manufacture. Site load can easily be altered to suit demand or reduction.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3.51 MW
EDF Energy (Thermal Generation) Limited, Cottam Power Station, Outgang Lane, Cottam, Retford, DN22 0NP (46 components)
• 2MW - 2.3MWh Battery Energy Storage System
• CMU INO200 represents demand assets on the Inovyn ChlorVinyls Ltd site in Runcorn, Cheshire. The asset uses electricity for Chemical manufacture. Site load can easily be altered to suit demand or reduction.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. Placeholder component for empty Unproven DSR CMU - Load Reduction upon instruction
Active • 2027-28 (T-4), 2025-26 (T-4) ...
1528.52 MW
Loading map...
Showing 7 locations