Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

14 unique locations (138 components)

MytheΒ Road. Tewkesbury. Gloucester. GL20 6AA (15 components)

Load reduction on site supported by non-exporting standby generation. (5)

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
Elphinstone Research Centre, Tranent EH33 2NE (4 components)
β€’ Load drop
β€’ Load drop by on-site generation
Inactive β€’ 2023-24 (T-4), 2022-23 (T-3) ...
Dock Yard Rd, Ellesmere Port, CH65 4EG (10 components)
β€’ BtM storage as standby generation, non-exporting
β€’ BtM storage providing standby capacity
β€’ BtM storage/standby generation; non exporting
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
Deansford Lane, DY10 4NB (15 components)

Load reduction on site supported by non-exporting standby generation.

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
Coldstore 3, Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (11 components)
β€’ Load drop.
β€’ Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
BRADWELL DBS PUMPING STATION, STRETFIELD, BRADWELL, HOPE VALLEY, DERBYSHIRE, S33 9JT (5 components)

Load reduction on site supported by non-exporting standby generation.

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
Asda Skelton, Cleveland Potash Limited, Boulby Mine, Saltburn-by-the-Sea TS13 4UZ (3 components)
β€’ Load curtailment
β€’ Load drop capability at mine shaft site located at Boulby Mine, Saltburn-by-the-Sea TS13 4UZ
Inactive β€’ 2023-24 (T-4), 2022-23 (T-3) ...
Asda Sheffield Drakehouse, Joan Ln, Bamford, Hope Valley S33 0AW (7 components)

Load reduction on site supported by non-exporting standby generation.

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
Asda Scunthorpe, Scunthorpe Cold Store, Cupola Way, Scunthorpe DN15 9YJ (9 components)
β€’ Load drop
β€’ Load reduction on flexible electricity consuming processes
Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
Asda Leek, Meerbrook, Leek, Staffordshire, ST13 8SN (8 components)

Load reduction on site supported by non-exporting standby generation.

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
Asda, EVESHAM ROAD, BROADWAY, WORCESTERSHIRE, WR12 7PA (9 components)

Load reduction on site supported by non-exporting standby generation.

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
Asda Dyce, Cairnton Road, Boyndie, Banffshire, AB45 2LR (8 components)
β€’ Standby diesel generator that reduces site load when generating.
β€’ Standby generation
β€’ Standby generation from a POSGU.
Inactive β€’ 2023-24 (T-4), 2022-23 (T-3) ...
Asda Didcot, Harrier Park, Hawksworth, Didcot, Oxfordshire, OX11 7PL (25 components)

load curtailment at site

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
Asda Chesterfield, Coldstore 5, 1B Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (9 components)

Load reduction on flexible electricity consuming processes (3)

Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
5.82 MW
Loading map...
Showing 14 locations