DSR (Demand Side Response)

17 unique locations (483 components)

XPO - Logistics Bedworth, St. Davids Way, Bermuda Park, Nuneaton, Warwickshire CV10 7SD  (20 components)
• CHP Unit
• CHP engine in a horticultural environment, natural gas, no aux load
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
17.61 MW
Wissington Sugar Factory British Sugar plc College Road Wissington King's Lynn PE33 9QG (33 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Existing CCGT
• The CMU is a gas fired CCGT CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
207.86 MW
Visitors Car Park, Alexandra Park, Alexandra Drive, St Helens, WA10 3TP (2 components)
• DSR Component providing load turn down at a retail store
• New build power station comprised of multiple reciprocating engines
Inactive • 2023-24 (T-4), 2021-22 (T-4)
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (48 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
32.05 MW
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (23 components)
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
• Gas fired CHP unit
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.70 MW
Seabank Power Limited Severn Road, Hallen, Bristol BS10 7SP (9 components)
• A Battery Energy Storage System
• Aggregate CMU from multiple sources
• Single Shaft CCGT (Module 2)
Active • 2028-29 (T-4), 2025-26 (T-4) ...
580.82 MW
Runcorn site HQ, South Parade, PO Box 9, Runcorn, WA7 4JE (12 components)
• 10MW of onshore wind generation
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Chemical manufacturer
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Rochester Power Generation Plant, Whitewall Road, Medway City Estate, Rochester, Kent, ME2 4DZ (17 components)
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Active • 2026-27 (T-4), 2025-26 (T-1) ...
52.07 MW
Muntons, Flamborough Maltings, Bridlington, East Yorkshire, YO15 1DY, UK. (24 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines
• Gas fired reciprocating engines.
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
13.03 MW
Lochawe, Dalmally, Argyll, PA33 1AN, Scotland (25 components)
• Refurbishment Unit 4 Cruachan pump storage hydro plant
• Unit 1 Cruachan pumped storage hydro plant
• Unit 2 Cruachan pumped storage hydro plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
827.61 MW
Liberty Lochaber Smelter, Fort William, Scotland PH33 6TH (53 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Existing CCGT Unit
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land off Mansfield Road, Little Morton Farm, Little Morton, Retford, DN22 8HE (17 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Battery energy storage unit
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.20 MW
Land Adjacent to Stobarts Logistics Off Branthwaite Road Lillyhall Workington Cumbria CA14 4ED (16 components)
• Gas reciprocating engines
• Generating Unit 2
• The East West Interconnector (EWIC) is a 400kV HVDC link between Connah's Quay in Wales and Woodland in Ireland.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.75 MW
Hawthorne Road, Bootle, Merseyside, L20 5AG. (4 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• DSR Component providing load turn down at a data centre
• The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (166 components)
• GT3
• Genset 1.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
13899.76 MW
Carlton, Stockton-on-Tees, TS21 1EA (7 components)
• 1.200MW of battery storage located at Stockton-on-Tees.
• Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.91 MW
Asda Sheffield Drakehouse, Joan Ln, Bamford, Hope Valley S33 0AW (7 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Load reduction on site supported by non-exporting standby generation.
• Sizewell B Power Station CMU 1: [SZ1-20] T_SIZB-1 + (50% x T_SIZB-D)
Active • 2027-28 (T-4), 2024-25 (T-4) ...
7.43 MW
Loading map...
Showing 17 locations