DSR (Demand Side Response)

17 unique locations (174 components)

Baunton WTW, A435, Baunton, Cirencester, United Kingdom, GL7 7BQ (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.09 MW
Berry Agile Solutions, Ellough Industrial Area, Ellough, Suffolk, NR34 7TB, UK (4 components)
• Gas fired generating units
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2024-25 (T-1), 2023-24 (T-4) ...
4.50 MW
Berry, Corby BMS Sallow Road, Weldon Industrial Estate, Corby, Northamptonshire, NN17 5JX (5 components)
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• Three POSGU (1.26MW, 1.0MW, 1.454MW) providing balancing services
Active • 2025-26 (T-4), 2024-25 (T-1) ...
EMR Cardiff (Roath Dock), Dowlais Wharf, Dowlais Wharf, CF10 4ED (11 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
17.22 MW
EMR Coventry, Webster Sidings, Coventry, CV6 5DJ (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
22.64 MW
EMR East Tilbury, Low Street Brickworks, Station Road, East Tilbury , RM18 8QR (22 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
45.67 MW
EMR Landor Street , Landor Street, Nechells , B8 1AF (22 components)
• 2*2 gas reciprocating engines with a total gross power capacity of 4.00 MW and a net power capacity of 3.960 MW.
• Component has yet to be procured.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
22.84 MW
EMR Northampton, Harvey Reeves Road, Northampton, NN5 5JR (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2023-24 (T-4) ...
11.42 MW
EMR Norwich, Atlas Works, Norwich Rd, Lenwade, Morton on the Hill, Norwich, NR9 5SN (12 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
17.22 MW
EMR Smethwick, Downing Street, Smethwick, West Midlands , B66 2PG (25 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
45.28 MW
Grimsbury WTW, Grimsbury Green, Grimsbury, Banbury, United Kingdom, OX16 3JJ (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.09 MW
Littleton Pastures Solar, Lakeshill Road, Worcestershire, WR118TS (3 components)
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA..
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.49 MW
Marchwood ERF, Oceanic Way, Marchwood Industrial Park, Normandy Way, Marchwood, Hampshire SO40 4BD (13 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• New Battery Storage Site comprising brand new batteries & inverters
• SolarPV generating station
Active • 2028-29 (T-4), 2026-27 (T-4) ...
10.68 MW
Marston WBS, Marsh Lane, Marston Sliproad, Oxford, United Kingdom, OX3 0PF (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.09 MW
OLD STRATFORD WB, OLD STRATFORD WB, Crosgrove Road, Old Stratford, MILTON KEYNES, MK19 6BB, (8 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU Component reduces import demand by turning on back up generation.
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
West Marsh Road Spalding Lincolnshire PE11 3BB (16 components)
• Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Wind Turbines to be installed at Crossdykes Wind Farm
Active • 2027-28 (T-4), 2024-25 (T-4) ...
255.05 MW
West Wickham (Croydon) WTW, Addington Road, , West Wickham, United Kingdom, BR4 9BF (4 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Loading map...
Showing 17 locations