DSR (Demand Side Response)

15 unique locations (192 components)

Asda Redditch, Jinnah Road, Redditch, B98 7ER (11 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
9.08 MW
Corby 3 - Sallow Road, Hunters Court, Corby, Northamptonshire, NN17 5JX (11 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
3.64 MW
DUSTON MILL-PITSFORD WA, DUSTON MILL RIVER INTAKE, NN5 6ER (19 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
39.68 MW
Eathorpe RI, Eathorpe, Leamington Spa, Warwickshire, CV33 9DF (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-1)
7.97 MW
EMR Cardiff (Roath Dock), Dowlais Wharf, Dowlais Wharf, CF10 4ED (11 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
17.22 MW
EMR Coventry, Webster Sidings, Coventry, CV6 5DJ (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
22.64 MW
EMR East Tilbury, Low Street Brickworks, Station Road, East Tilbury , RM18 8QR (22 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
45.67 MW
EMR Kingsbury, Trinity Rd, Tamworth, B78 2LB (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
22.64 MW
EMR Landor Street , Landor Street, Nechells , B8 1AF (22 components)
• 2*2 gas reciprocating engines with a total gross power capacity of 4.00 MW and a net power capacity of 3.960 MW.
• Component has yet to be procured.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
22.84 MW
EMR Northampton, Harvey Reeves Road, Northampton, NN5 5JR (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2023-24 (T-4) ...
11.42 MW
EMR Norwich, Atlas Works, Norwich Rd, Lenwade, Morton on the Hill, Norwich, NR9 5SN (12 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
17.22 MW
EMR Smethwick, Downing Street, Smethwick, West Midlands , B66 2PG (25 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
45.28 MW
Massmould Ltd - Milton Keynes, Bradbourne House, Bradbourne Drive, Tilbrook, Milton Keynes, MK7 8AT (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
18.48 MW
SHENLEY GROUNDS WB, WHADDON ROAD CALVERTON, MK19 6EU (10 components)
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• The CMU Component reduces import demand by turning on back up generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
17.03 MW
Unit 1- Rushden, Higham Ferrers Bypass, Rushden, Northamptonshire, NN10 8RP (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
21.29 MW
Loading map...
Showing 15 locations