Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

114 unique locations (1378 components) - Page 1 of 5

133 Balornock Road, Glasgow, G21 3UW (20 components)

Generators on hospital site (3)

Active • 2024-25 (T-1), 2023-24 (T-4) ...
56.09 MW
15-17 Deer Park Rd, Moulton Park Industrial Estate, Northampton NN3 6RX, United Kingdom (13 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
14.97 MW
167 - 600 Hollands Recycling, Bentley Road South, Darlaston, WS10 8LN (13 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.89 MW
174 - 601 Farnham Road, Upper Froyle, Alton, GU34 4JD (12 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.71 MW
195 Aylesone Rd, Leicester LE2 7QJ (33 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
14.80 MW
1 Waterfront Avenue, Edinburgh, EH5 1SG (26 components)

Office site with behind the meter generation (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
14.71 MW
2600 John Smith Drive, Oxford, OX4 2JY (37 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
16.46 MW
2 Leeds City Office Park, Leeds, LS11 5BD (8 components)
• Office site with behind the meter back-up generation (2)
• Office site with behind the meter back-up generation.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
3.17 MW
2 Whitehouse Way, Peterlee, County Durham, SR8 2RA (5 components)

3 MW of demand reduction (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
12.64 MW
43 Devon Street, London, SE15 1AL (12 components)
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes. (2)
• Lithium ion battery storage at a material recycling facility in south east London.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
9.09 MW
4 Chemistry Ln, Pentre, Deeside, CH5 2DA (18 components)

Peak power plant (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
186.35 MW
530 London Road Thornton Heath London CR7 7YE (5 components)

Hospital (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
13.06 MW
5 Howick Place London SW1P 1WG (10 components)

The CMU component is an aggregation of turn-down and onsite generation (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
145.13 MW
670 Ajax Avenue, Slough, SL1 4BG (4 components)

DSR Component providing load turn down at a data centre (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
8.64 MW
97 Talbot Road, Stretford, Manchester, Lancashire, M16 0TW (4 components)

Offsite with behind the meter generation (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
2.93 MW
Addo Food Group Fulney Lane Spalding Lincolnshire PE12 6EZ (2 components)

4 MW of demand reduction (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
3.37 MW
ADDO FOOD GROUP, FULNEY LANE, SPALDING, LINCOLNSHIRE, PE12 6EZ (3 components)

0.27MW of demand reduction (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
0.56 MW
Alexandra Warehouse, Ravenhead Road, St Helens, WA10 3LR (13 components)

Crystal glass recycling facility. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.90 MW
Asda ADC, Foxbridge Way, Normanton, WF6 1TL (12 components)
• Load curtailment from refridgeration
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
3.49 MW
ASDA Ambient Depot, Earls Road, Earlsgate Park Grangemouth, FK3 8UU (11 components)
• Load curtailment from refridgeration
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
3.36 MW
ASDA Bedford - Chilled Distribution Centre, Marsh Leys, Woburn Rd, MK43 9AB (13 components)
• Load curtailment from refridgeration
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
3.90 MW
Asda Belvedere, 4 Norman Rd, Belvedere DA17 6LD (12 components)
• Load curtailment from refridgeration
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
3.49 MW
Asda Boston, Monument Road, Bicker, Lincolnshire PE20 3DJ (6 components)
• Load curtailment at site via standby generation (2)
• Load curtailment and standby generation
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
4.56 MW
Asda Boston, Pudding Lane Spalding, Lincs, PE11 3TJ (7 components)
• Load curtailment via standby generation (2)
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
14.05 MW
Asda Boston, Unit 2 Welland Business Park, Clay Lake, Spalding PE12 6BL (5 components)

Load reduction on site supported by non-exporting standby generation. (3)

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
1.17 MW
Loading map...
Showing 25 locations