Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

3 unique locations (27 components)

Pleasance Road ? Battery, Coupar Site, Pleasance Road, Blairgowrie, PH13 9JB (10 components)
• Battery storage plant
• Component has yet to be procured.
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste which can generate up to 35MW of power, although it is currently constrained by a grid connection of 31.43MW (at export meter point). Located in Glass Avenue, Cardiff.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
36.31 MW
Land at Lymedale Business Park, Holditch Road, Newcastleunder-Lyme, Staffordshire,ST5 9JA (8 components)
• 20 MW power plant comprising of 10 x 2MW gas fired reciprocating engines.The Power plant is connected to the local distribution network and local gas network.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New reciprocating gensets in acoustic building/enclosure
Active • 2026-27 (T-4), 2023-24 (T-4) ...
Avonmouth ERF, Severn Road, Chittering, Bristol, BS11 0YU (9 components)
• Twin stream Energy from Waste plant with a connection capacity of 37.216MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
• Two CHP engines in horticultural environment with no auxilliary load
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
32.61 MW
Loading map...
Showing 3 locations