Plot 6 Barrow Man Road, Birchington CT7 0AX (19 components)
• CHP engine in a horticultural environment, natural gas, no aux load
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
14.72 MW
Land to the South of Clay Hill off Hamlet Hill CM19 5JR (5 components)
• Bus depot site
• Gas reciprocating engines
• New build power station comprised of multiple reciprocating engines.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
46.74 MW
Land North East Of East Sleekburn C415 Spine Road To East Sleekburn, Bedlington, Northumberland, NE22 7BG (8 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• NSL is a 1,400 MW subsea high-voltage direct current electricity cable under construction between Norway and the United Kingdom which will connect the Transmission Systems of Norway and Great Britain. The cable will run from Kvilldal in Norway, to Blyth in the United Kingdom. The converter station in England will be located near to the cable landfall in East Sleekburn village and it will be connected to the National Grid at the Blyth substation.
• New build power station comprised of multiple reciprocating engines.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
1218.00 MW
Land at Rhyd y Groes Rhosgoch Anglesey, Wales LL66 0AT (5 components)
• 1 x 49.99 MW distribution connected battery storage plant located on agricultural land on the island of Anglesey, north Wales.
• Component has yet to be procured.
• Load reduction upon instruction
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Campus Data Centre, Spring Way, Hemel Hempstead, Herts, HP2 7SU (2 components)
• DSR component offering flexibility delivered by load turn down at a data centre
• New build power station comprised of multiple reciprocating engines.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
ASDA Import Center, Dabholm Rd, Middlesbrough, TS6 7RU (12 components)
• Load curtailment from refridgeration
• Load reduction on site supported by non-exporting standby generation.
• battery energy storage system
Active • 2028-29 (T-4), 2024-25 (T-1) ...
19.70 MW
ASDA Distribution Centre, Galleon Blvd, Dartford, DA2 6QA (13 components)
• CMU consisting of multiple reciprocating engines and alternators
• Load curtailment from refridgeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
20.33 MW
15-17 Deer Park Rd, Moulton Park Industrial Estate, Northampton NN3 6RX, United Kingdom (17 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
• New build power station comprised of multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...