DSR (Demand Side Response)

15 unique locations (163 components)

Lubenham Road, Market Harborough, Leicestershire, LE16 9NP *Post code and grid reference may not match because site address is not yet registered with post office. We have used nearest available post code. (5 components)
• Array of lithium ion batteries in a power generation environment, proving power to National Grid. Change of use of land from agricultural to new build generation.
• New reciprocating gensets in acoustic enclosure
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land to north east of Electricity Substation, Fordbridge Lane, Blackwell DE55 5JY Alfreton (6 components)
• A standby diesel generator on a waster water treatment works.
• New reciprocating gensets in acoustic enclosure
• The CMU Component is made up of gas-fired engines.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
20.97 MW
Land off Sookholme Road, Vernon Street Industrial Estate, Shirebrook, Mansfield, NG20 8SG (24 components)
• Reciprocating genset
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
• The Moyle Interconnector links the electricity grids of Northern Ireland and Scotland through submarine cables running between converter stations at Ballycronan More in Islandmagee, County Antrim and Auchencrosh in Ayrshire. The link has a capacity of 500 MW. The Moyle Interconnector is owned and operated by Moyle Interconnector Limited, which is in turn financed through Moyle Holdings Limited and Moyle Interconnector (Financing) Public Limited Company, all part of the Mutual Energy Limited group of companies.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.56 MW
Land off, Little Morton Farm, Little Morton, Retford, DN22 8BE (4 components)
• Battery energy storage unit
• Generating Unit 1
• To be confirmed once CMU components are known
Active • 2025-26 (T-4), 2022-23 (T-4)
19.60 MW
Land off High View Road, South Normanton, Bolsover, Derbyshire, DE55 2EY (12 components)
• Component has yet to be procured.
• Reciprocating genset
• The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.19 MW
Land at Orwell Street, East Marsh, Grimsby DN31 3HF Grimsby (4 components)
• N/A
• New reciprocating gensets in acoustic enclosure
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2024-25 (T-4), 2024-25 (T-1) ...
5.47 MW
Land At Mitchells Industrial Park, Bradberry Balk Lane, Wombwell, Barnsleym, S73 8HR (17 components)
• 5 MW of demand reduction
• CHP Unit
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
7.44 MW
Land At Mitchells Ind Park, Barnsley, S73 8HR (10 components)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• Battery energy storage unit
• Component has yet to be procured.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.13 MW
Land at Lymedale Business Park, Holditch Road, Newcastleunder-Lyme, Staffordshire,ST5 9JA (8 components)
• 20 MW power plant comprising of 10 x 2MW gas fired reciprocating engines.The Power plant is connected to the local distribution network and local gas network.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New reciprocating gensets in acoustic building/enclosure
Active • 2026-27 (T-4), 2023-24 (T-4) ...
Hunslet Park Depot, Donisthorpe Street, Leeds, Yorkshire, LS10 1PL (9 components)
• 0.39MW Battery Storage located at Hunslet Park Depot, Leeds
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• New reciprocating gensets in acoustic enclosure
Active • 2024-25 (T-4), 2023-24 (T-4) ...
EDF Energy, Hunterston B power station, West Kilbride, Ayrshire, KA23 9QX (40 components)
• Existing CCGT Unit
• Hunterston B Power Station CMU 7: [HU7-21] T_HUNB-7 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
• Hunterston B Power Station CMU 8: [HU8-21] T_HUNB-8 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
Active • 2025-26 (T-4), 2024-25 (T-4) ...
1607.21 MW
Asda Swindon Haydon, Windmill Hill Business Park, Swindon, SN5 6QR (6 components)
• Load curtailment and standby generation
• Mix of load curtailment and standby generation
• New reciprocating gensets in acoustic enclosure
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Asda Longwell Green, Combe Park, Bath, BA1 3NG (6 components)
• Load curtailment via standby generation
• New reciprocating gensets in acoustic enclosure
• Standby generation x 2
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Asda Far Cotton, Kings Park Road, Moulton Park, Northampton, NN3 6NW (6 components)
• Load curtailment on site and standby generation
• Load reduction via standby generation taking onsite load
• New reciprocating gensets in acoustic enclosure
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Asda Bournemouth, Portman House, Richmond Hill, Bournemouth, Dorset BH2 6EP (6 components)
• Load curtailment and standby generation
• Mix of load curtailment and standby generation
• New reciprocating gensets in acoustic enclosure
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 15 locations