DSR (Demand Side Response)

19 unique locations (287 components)

XPO - Southampton, Goodward Road, Eastleigh, SO50 4NT (12 components)
• Energy facility comprising of reciprocating engine sets.
• Gas fired reciprocating engines.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
11.96 MW
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (30 components)
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2330.50 MW
Tir John N Rd, St Thomas, SA1 8NZ (10 components)
• 10 MW of demand reduction
• Reciprocating engines
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Royal South Hants Hospital, Graham Road, Southampton, Hampshire, SO14 0YG (23 components)
• 0.725MW Combined Heat and Power Plant Royal South Hants Hospital
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2025-26 (T-4), 2024-25 (T-4) ...
47.83 MW
Muntons, Flamborough Maltings, Bridlington, East Yorkshire, YO15 1DY, UK. (24 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines
• Gas fired reciprocating engines.
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
13.03 MW
Marchwood ERF, Oceanic Way, Marchwood Industrial Park, Normandy Way, Marchwood, Hampshire SO40 4BD (13 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• New Battery Storage Site comprising brand new batteries & inverters
• SolarPV generating station
Active • 2028-29 (T-4), 2026-27 (T-4) ...
10.68 MW
Little Barford Power Station Little Barford St Neots PE19 6YT (32 components)
• 49.9MW Lithium Ion Batteries and power conversion system installed in a compound at Chickerell Substation.
• Little Barford 1 CCGT MSID: 4052
• Little Barford 1 OCGT . fuel type is distillate MSID: 4052
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3881.97 MW
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (16 components)
• Gas fired reciprocating engines.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Harts Farm Way, Havant, PO9 1HS (4 components)
• Aggregate CMU from multiple sources
• Gas fired reciprocating engines
Inactive • 2022-23 (T-4), 2019-20 (T-1)
EnviroWales - Ebbw Vale - Site 2, Plateaux 1 & 2 Rassau Industrial Estate Ebbw Vale Blaenau Gwent NP23 5SD (17 components)
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2025-26 (T-4) ...
12.93 MW
Dorehouse Business Park Sheffield S13 9LT BB10 2TN (8 components)
• 1 x hydro turbine & synchronous generator
• Aggregate CMU from multiple sources
• Gas fired reciprocating engines.
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (11 components)
• 48 MW Battery Energy Storage facility
• 49.5 MW Battery Energy Storage facility
• Generators on hospital site
Active • 2025-26 (T-4), 2024-25 (T-4) ...
75.39 MW
Celsa Steel, Seawall Road, Tremorfa, Cardiff, CF24 5TH (18 components)
• Gas fired reciprocating engines.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
166.57 MW
Brunel Way, Briton Ferry, SA11 2GA (14 components)
• Gas fired reciprocating engines.
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
• Reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
12.83 MW
Brook Farm, Arncott, OX25 1NY (2 components)
• Gas fired reciprocating engines.
• N/A
Inactive • 2022-23 (T-4)
Asda Northampton Thornton, Thorton Rd Kingsthorpe, Northampton, NN2 6LS (11 components)
• Gas fired reciprocating engines.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2023-24 (T-1) ...
13.36 MW
Asda Garston, St Marys Road Garston, Liverpool, L19 1SJ (12 components)
• Load curtailment
• Load curtailment from refridgeration
• N/A
Active • 2028-29 (T-4), 2024-25 (T-1) ...
18.11 MW
ASDA Didcot Ambient Distribution Centre, Sutton Courtenay Rd, Abingdon, OX14 4SE (11 components)
• 4 x reciprocating engines
• Load curtailment from refridgeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
10.21 MW
1, THE OLD BARN PURLIEUS, MINETY, MALMESBURY SN16 9RP (Nearest postcode to grid reference: SN16 9DX). (19 components)
• Battery Storage Plant
• Load reduction on site supported by non-exporting standby generation.
• Reciprocating genset in acoustic enclosure
Active • 2025-26 (T-4), 2023-24 (T-4) ...
53.56 MW
Loading map...
Showing 19 locations