DSR (Demand Side Response)

11 unique locations (336 components)

Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (67 components)
• A gas engine CHP site providing electricity & heat to the associated development
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• Load reduction on site supported by non-exporting standby generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
XPO - Logistics Bedworth, St. Davids Way, Bermuda Park, Nuneaton, Warwickshire CV10 7SD  (20 components)
• CHP Unit
• CHP engine in a horticultural environment, natural gas, no aux load
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
17.61 MW
Trostre Works Llanelli Carmarthenshire SA14 9SD (112 components)
• Manufacturing site providing demand response
• N/A
Active • 2025-26 (T-1), 2023-24 (T-4) ...
120.35 MW
T&L Sugars Limited, Thames Refinery, Factory Road, Silvertown, London, United Kingdom, E16 2EW (51 components)
• A new build, gas fuelled generation station.
• No2 Steam turbine - Allen Steam Turbines/NG Model MB510 - 2009 - Nominal power rating 14500kWe
• No5 Gas Turbine - European Gas Turbines SGT200 'Tornado' - S765/01 1997 - Nominal power output 6000kWe
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
52.83 MW
Pit Hey Place, Pimbo Industrial Estate, Skelmersdale, WN8 9PS (2 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2022-23 (T-3), 2020-21 (T-4)
Kenley Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (6 components)
• New build power station comprised of multiple reciprocating engines.
• Peak power plant
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Hem Heath, Sir Stanley Matthews Way, Trentham Lakes, Trentham, Stoke on Trent, ST4 8GR (8 components)
• Gas fired reciprocating engine(s)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Greenfields Farm Worcester Road Upton Warren Bromsgrove B61 7JD (12 components)
• Battery energy storage unit
• N/A
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.86 MW
Gate Lodge, Boundary Farm, Styal Road, Wythenshawe, Manchester, M22 5YA (21 components)
• Site with behind the meter diesel generation - offsetting site load and exporting surplus.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
37.75 MW
Asda Moorthorpe, 18-20 Langthwaite Rd, South Kirkby, Pontefract WF9 3AP (8 components)
• A recently completed power plant, with associated civil works, switchgear and electrical connection.
• Load reduction
• Load shedding
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
1.02 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (29 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• New build transmission connected battery storage site
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.90 MW
Loading map...
Showing 11 locations