Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

3 unique locations (38 components)

Hammersmith Hospital, Du Cane Road, Shepherds Bush, London, W12 0HS (11 components)
• 1x diesel generator with a total rated gross power capacity of 2.900 MW
• A gas turbine CHP, providing steam and electricity to Hammersmith Hospital
• Unit 3 at Saltend Power Station
Active • 2024-25 (T-1), 2022-23 (T-3) ...
2.33 MW
ROOM SOUTH QUARRY, BROOM CROSS ROAD, STANFORD, SG18 9LB (5 components)
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• Unit 1 at Saltend Power Station
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Waterhouse Mills, Beetham, Milnthorpe, Cumbria, LA7 7AR (22 components)
• DSR component providing load turn down at a retail store
• Paper products manufacturing site carrying out DSR by load turn-down
• Unit 3 at Saltend Power Station.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
20.01 MW
Loading map...
Showing 3 locations