Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

8 unique locations (86 components)

Waterhouse Mills, Beetham, Milnthorpe, Cumbria, LA7 7AR (22 components)
• DSR component providing load turn down at a retail store
• Paper products manufacturing site carrying out DSR by load turn-down
• Unit 3 at Saltend Power Station.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
20.01 MW
Springfield Farm, Glendon, Kettering NN14 1QA. (6 components)
• Aggregate CMU from multiple sources
• Gas and/or diesel reciprocating engines.
Inactive • 2022-23 (T-3), 2017-18 (T-1)
Land North East Of East Sleekburn C415 Spine Road To East Sleekburn, Bedlington, Northumberland, NE22 7BG (8 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• NSL is a 1,400 MW subsea high-voltage direct current electricity cable under construction between Norway and the United Kingdom which will connect the Transmission Systems of Norway and Great Britain. The cable will run from Kvilldal in Norway, to Blyth in the United Kingdom. The converter station in England will be located near to the cable landfall in East Sleekburn village and it will be connected to the National Grid at the Blyth substation.
• New build power station comprised of multiple reciprocating engines.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
1218.00 MW
Land at Rhyd y Groes Rhosgoch Anglesey, Wales LL66 0AT (5 components)
• 1 x 49.99 MW distribution connected battery storage plant located on agricultural land on the island of Anglesey, north Wales.
• Component has yet to be procured.
• Load reduction upon instruction
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Kenley Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (6 components)
• New build power station comprised of multiple reciprocating engines.
• Peak power plant
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Bletcham Way, Fennylock, Milton Keynes, Bucks MK1 1QA (10 components)
• 2 x 0.8MW POSGU (standby generation).
• New build power station comprised of multiple reciprocating engines.
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
ASDA Import Center, Dabholm Rd, Middlesbrough, TS6 7RU (12 components)
• Load curtailment from refridgeration
• Load reduction on site supported by non-exporting standby generation.
• battery energy storage system
Active • 2028-29 (T-4), 2024-25 (T-1) ...
19.70 MW
15-17 Deer Park Rd, Moulton Park Industrial Estate, Northampton NN3 6RX, United Kingdom (17 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
• New build power station comprised of multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 8 locations