Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

15 unique locations (228 components)

Trostre Works Llanelli Carmarthenshire SA14 9SD (112 components)
• Manufacturing site providing demand response
• N/A
Active • 2025-26 (T-1), 2023-24 (T-4) ...
120.35 MW
Lubenham Road, Market Harborough, Leicestershire, LE16 9NP *Post code and grid reference may not match because site address is not yet registered with post office. We have used nearest available post code. (5 components)
• Array of lithium ion batteries in a power generation environment, proving power to National Grid. Change of use of land from agricultural to new build generation.
• New reciprocating gensets in acoustic enclosure
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land off Salmon Lane, Annesley, Nottinghamshire NG15 0DF (10 components)
• New reciprocating gensets in acoustic enclosure
• Onsite load reduction and back up generation behind the meter on multiple sites
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
7.44 MW
Land off Orwell Street, Grimsby, DN31 3HF (3 components)
• New reciprocating gensets in acoustic enclosure
• To be confirmed once CMU components are known
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land off Mansfield Road, Little Morton Farm, Little Morton, Retford, DN22 8HE (17 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Battery energy storage unit
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.20 MW
Land At Mitchells Industrial Park, Bradberry Balk Lane, Wombwell, Barnsleym, S73 8HR (17 components)
• 5 MW of demand reduction
• CHP Unit
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
7.44 MW
Land At Mitchells Ind Park, Barnsley, S73 8HR (10 components)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• Battery energy storage unit
• Component has yet to be procured.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.13 MW
Land At Lymedale Business Park, Holditch Road, Newcastleunder-Lyme, Staffordshire, ST5 9JA (4 components)
• Load drop capability at mine shaft site located at Boulby Mine, Saltburn-by-the-Sea TS13 4UZ
• New reciprocating gensets in acoustic building/enclosure
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Cwm Rheidol Power Station (being one out of two) which is supplied by water from the Dinas Reservoir.
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land at Lymedale Business Park, Holditch Road, Newcastleunder-Lyme, Staffordshire,ST5 9JA (8 components)
• 20 MW power plant comprising of 10 x 2MW gas fired reciprocating engines.The Power plant is connected to the local distribution network and local gas network.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New reciprocating gensets in acoustic building/enclosure
Active • 2026-27 (T-4), 2023-24 (T-4) ...
Greenfields Farm Worcester Road Upton Warren Bromsgrove B61 7JD (12 components)
• Battery energy storage unit
• N/A
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.86 MW
Bodelwyddan, Royal Welch Ave, Bodelwyddan, Rhyl LL18 5TQ, United Kingdom (6 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Asda Swindon Haydon, Windmill Hill Business Park, Swindon, SN5 6QR (6 components)
• Load curtailment and standby generation
• Mix of load curtailment and standby generation
• New reciprocating gensets in acoustic enclosure
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Asda Longwell Green, Combe Park, Bath, BA1 3NG (6 components)
• Load curtailment via standby generation
• New reciprocating gensets in acoustic enclosure
• Standby generation x 2
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Asda Far Cotton, Kings Park Road, Moulton Park, Northampton, NN3 6NW (6 components)
• Load curtailment on site and standby generation
• Load reduction via standby generation taking onsite load
• New reciprocating gensets in acoustic enclosure
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Asda Bournemouth, Portman House, Richmond Hill, Bournemouth, Dorset BH2 6EP (6 components)
• Load curtailment and standby generation
• Mix of load curtailment and standby generation
• New reciprocating gensets in acoustic enclosure
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 15 locations