11 unique locations (108 components)

Church Manorway, Erith DA8 1DL (9 components)

gas-fired CHP unit

Active • 2025-26 (T-4), 2024-25 (T-1) ...
25.17 MW
Component has yet to be procured. (38 components)

Component has yet to be procured.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
252.48 MW
Land at Back Lane, Wessington, Derbyshire, DE55 6AJ (8 components)

New reciprocating gensets in acoustic enclosure

Inactive • 2023-24 (T-4), 2022-23 (T-3)
7.44 MW
Land east of Nottingham Road, Loughborough, Leicestershire, LE11 1ET (1 component)

3 X 2MW gas fuelled generators installed on a compound on land east of Nottingham Road

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land off Nottingham Rd, Loughborough Leicestershire LE11 1ET (2 components)

Gas fired reciprocating engines

Active • 2025-26 (T-4), 2024-25 (T-4) ...
3.80 MW
Land to the south of Elvanfoot, South Lanarkshire, ML12 6RL (nearest) (2 components)

New Build Onshore Wind Farm.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Mannelli House, Cowper Road, Gilwilly Industrial Estate, Penrith, CA11 9BN (2 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
NORWICH ROAD INDUSTRIAL ESTATE, HALESWORTH, SUFFOLK, IP19 8QJ (3 components)
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import and export capacity of 40MW.
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import capacity of 40 MVA and export capacity of 40 MW.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
8.54 MW
Saltend Lane, HULL, HU12 8PP (3 components)
• Load reduction
• Load reduction on site
Active • 2028-29 (T-4), 2025-26 (T-4) ...
14.86 MW
To be determined (28 components)

Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.

Inactive • 2022-23 (T-3), 2022-23 (T-4) ...
141.16 MW
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (12 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...