DSR (Demand Side Response)

3 unique locations (19 components)

Vacant land, Portsdown Technology Park, Southwick Rd, Portsmouth, Hampshire, PO6 3RU (5 components)
• 20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Griffiths Road, Lostock Gralam, Northwich, CW9 7XU (11 components)
• 20 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 20MW power plant comprising gas reciprocating engines. The power plant is connected to the local electricity distribution network and local gas network.
• 6MW power plant comprising gas reciprocating engines. The power plant is connected to the local electricity distribution network and local gas network.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
74.78 MW
Ervin Amasteel 11KV connection George Henry Road Tipton West Midlands DY4 7BZ (3 components)

0.4MW demand reduction

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 3 locations