Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

14 unique locations (381 components)

Trostre Works Llanelli Carmarthenshire SA14 9SD (112 components)
• Manufacturing site providing demand response
• N/A
Active • 2025-26 (T-1), 2023-24 (T-4) ...
120.35 MW
Plot B at Severn Road Avonmouth BS10 7SE (11 components)
• Existing Generator Battery Energy Storage System
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
• New Build Battery Energy Storage Systems
Active • 2025-26 (T-4), 2025-26 (T-1) ...
5.25 MW
LAND AT HEATH BUSINESS PARK GRANGE WAY COLCHESTER ESSEX CO2 8GU (10 components)
• CMU consisting of a gas reciprocating engine and alternator
• CMU consisting of a gas reciprocating engine and an alternator
• Load reduction upon instruction
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
4.83 MW
Land Adjacent to Electricity Sub Station, Stonehill, Charlton, Malmesbury, Wiltshire, SN16 9DX (15 components)
• 49.900MW Battery Energy Storage System
• 49.9MW Battery Energy Storage System located in Malmesbury, Wiltshire
• Battery Storage and demand reduction located at Abellio Walworth bus depot
Active • 2027-28 (T-4), 2023-24 (T-4) ...
EMR Liverpool Alexandra Docks, 1, Alexandra Bldg, Alexandra Dock, Liverpool, L20 1BX (12 components)
• Existing Generation on existing site - CHP
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
20.15 MW
Dock Yard Power, Dock Yard Road, Ellesmere Port, CH65 4EF (10 components)
• CMU consisting of multiple reciprocating engines and alternators
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
11.91 MW
Commerce Way Flitwick MK45 5BP (10 components)
• 49.999 MW pumped storage facility in Gwynedd, North Wales.
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Churchill Pumping Station, Stourbridge Road, Ismere, Kidderminster, DY10 3NX (18 components)
• Back up generation
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. Placeholder component for empty Unproven DSR CMU - Load Reduction upon instruction
• Onsite generation
Inactive • 2022-23 (T-1), 2019-20 (T-1) ...
1.71 MW
BWW028, Sperrings Green, Chewton Mendip, Chewton Mendip, BA3 4LN (20 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• N/A
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
7.31 MW
Asda Northampton Thornton, Thorton Rd Kingsthorpe, Northampton, NN2 6LS (11 components)
• Gas fired reciprocating engines.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2023-24 (T-1) ...
13.36 MW
Asda Edinburgh, 100 The Jewel, Brunstane, Edinburgh, EH15 3AR (13 components)
• Existing Generation on existing site - CHP
• Load curtailment from refridgeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
19.96 MW
ASDA Didcot Ambient Distribution Centre, Sutton Courtenay Rd, Abingdon, OX14 4SE (11 components)
• 4 x reciprocating engines
• Load curtailment from refridgeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
10.21 MW
1 Thane Road West, Nottingham, NG2 3AA (125 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
101.02 MW
125 Fullarton Drive, Glasgow East Investment Park GLASGOW G32 8FG (3 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on-site and standby generation
Inactive • 2022-23 (T-1), 2020-21 (T-4) ...
Loading map...
Showing 14 locations