DSR (Demand Side Response)

7 unique locations (288 components)

Asda Garston, St Marys Road Garston, Liverpool, L19 1SJ (12 components)
• Load curtailment
• Load curtailment from refridgeration
• N/A
Active • 2028-29 (T-4), 2024-25 (T-1) ...
18.11 MW
Crosby Power, Church Street, Bootle, L20 1AF (7 components)
• CMU consisting of multiple reciprocating engines and alternators
• N/A
Active • 2025-26 (T-4), 2023-24 (T-1) ...
8.20 MW
Energy Center, Ashton Street, Liverpool, L69 3GB (68 components)
• Longannet coal fired power station - Unit 3
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Active • 2024-25 (T-4), 2023-24 (T-4) ...
18.40 MW
Engie Great Coates, Grimsby, DN31 2TT (16 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
• N/A
Inactive • 2023-24 (T-1), 2022-23 (T-4) ...
12.43 MW
Maybrook Road, Maybrook Business Park, Minworth, Sutton Coldfield, B76 1BE (18 components)
• N/A
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
12.09 MW
Trostre Works Llanelli Carmarthenshire SA14 9SD (112 components)
• Manufacturing site providing demand response
• N/A
Active • 2025-26 (T-1), 2023-24 (T-4) ...
120.35 MW
University of Warwick, Coventry, CV4 7AL (55 components)
• N/A
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
• One of six CHP units at University of Warwick, Coventry, CV4 7AL.
Active • 2025-26 (T-1), 2023-24 (T-4) ...
20.78 MW
Loading map...
Showing 7 locations