Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

13 unique locations (211 components)

Windsor Battery West, Millstream East, Maidenhead Road, Windsor, Berkshire, SL4 5GD. (9 components)
• Battery Storage
• Chemical manufacturer
• Glenlee hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
0.05 MW
Waterswallows, Tunstead Quarry, Tunstead, Buxton, Derbyshire SK17 8TG (23 components)
• On-site existing CHP generating unit
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-1), 2022-23 (T-4) ...
37.31 MW
Thirsk Factory, Dalton Airfield, Topcliffe, Thirsk, YO7 3HE. (10 components)
• 1.280MW CHP
• Aggregate CMU from Multiple Sources
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
274.49 MW
Thatcham Grid Substation, Piper's Lane, Off Station Road, Thatcham, RG19 4NA (15 components)
• 6 x reciprocating engines
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
• Distribution Centre with behind the meter back-up generation.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (12 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
• Peak power plant
Active • 2025-26 (T-4), 2023-24 (T-1) ...
8.75 MW
BOC Scunthorpe, Warren Road, Scunthorpe, DN15 6XH (20 components)
• Industrial Gases production processes. DSR delivered through process interruption
• Industrial Gases production site. DSR delivered through reduction of import at site boundary, primarily through process interruption.
• Industrial Gases production site. DSR provided through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
80.96 MW
BOC Motherwell, Chapelknowle Road, Carfin, ML1 5LF (21 components)
• Industrial Gases production processes. DSR delivered through process interruption
• Industrial Gases production processes. DSR delivered through reduction of import at site boundary, primarily process interruption.
• Industrial Gases production site. DSR provided through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
40.48 MW
BOC Middlesbrough, Teessdock Road, Grangetown, TS6 7RT (22 components)
• Industrial Gases production site. DSR delivered through reduction of import at site boundary, primarily through process interruption.
• Industrial Gases production site. DSR provided through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
80.96 MW
BOC Margam, Longlands Lane, Port Talbot, SA13 2NS (21 components)
• Industrial Gases production processes. DSR delivered through process interruption
• Industrial Gases production site. DSR delivered through reduction of import at site boundary, primarily through process interruption.
• Industrial Gases production site. DSR provided through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
80.96 MW
BOC Fawley, Cadland Road, Hythe, SO45 3NX (21 components)
• Industrial Gases production processes. DSR delivered through process interruption
• Industrial Gases production processes. DSR delivered through reduction of import at site boundary, primarily process interruption.
• Industrial Gases production site. DSR provided through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
49.68 MW
BOC Brinsworth, Bawtry Road, Brinsworth, Rotherham, S60 5NT (22 components)
• BtM storage providing standby capacity
• Industrial Gases production processes. DSR delivered through process interruption
• Industrial Gases production site. DSR provided through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
49.68 MW
Asda Gosforth Wansbeck Road, Wansbeck Road South Fawdon, Newcastle, NE3 3HQ (10 components)
• Gas Turbine Cogeneration Unit GT3
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
9.08 MW
3 Fountain Drive, Inchinnan Business Park, Paisley, PA4 9RF. (5 components)
• 1 x hydro turbine & synchronous generator
• Bus depot site
• MTU - 8V400064 1.013MW
Active • 2024-25 (T-1), 2023-24 (T-4) ...
Loading map...
Showing 13 locations