Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

628 unique locations (6587 components) - Page 1 of 26

1020 SLUTCHERS LANE, WARRINGTON, WA1 1QL (4 components)

gas generation (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
28.03 MW
150 Maylands Avenue, Hemel Hempstead, Herts, HP2 7DF (1 component)

DSR Component providing load turn down at a data centre

Inactive • 2021-22 (T-4)
12.95 MW
15-17 Deer Park Rd, Moulton Park Industrial Estate, Northampton NN3 6RX, United Kingdom (13 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
14.97 MW
167 - 600 Hollands Recycling, Bentley Road South, Darlaston, WS10 8LN (13 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.89 MW
172-174 Rye Lane PeckhamLondon, London, SE15 4NB (14 components)
• Load curtailment (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.33 MW
174 - 601 Farnham Road, Upper Froyle, Alton, GU34 4JD (12 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.71 MW
195 Aylesone Rd, Leicester LE2 7QJ (33 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
14.80 MW
1 Waterfront Avenue, Edinburgh, EH5 1SG (26 components)

Office site with behind the meter generation (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
14.71 MW
2 Leeds City Office Park, Leeds, LS11 5BD (8 components)
• Office site with behind the meter back-up generation (2)
• Office site with behind the meter back-up generation.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
3.17 MW
36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PE (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

Inactive • 2022-23 (T-1), 2021-22 (T-4)
0.26 MW
3 Opal Way, Stone ST15 0BQ, UK (6 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
2.06 MW
43 Devon Street, London, SE15 1AL (12 components)
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes. (2)
• Lithium ion battery storage at a material recycling facility in south east London.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
9.09 MW
4 Chemistry Ln, Pentre, Deeside, CH5 2DA (18 components)

Peak power plant (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
186.35 MW
5 Howick Place London SW1P 1WG (10 components)

The CMU component is an aggregation of turn-down and onsite generation (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
145.13 MW
670 Ajax Avenue, Slough, SL1 4BG (4 components)

DSR Component providing load turn down at a data centre (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
8.64 MW
6 Braham St Aldgate London E1 8EE (4 components)

Site with behind the meter diesel generation - offsetting site load and exporting surplus. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
4.03 MW
ADM Milling Tilbury Flour Mill, Tilbury Docks, Tilbury, Essex,RM18 7JU (5 components)

Flour & semolina milling business (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
5.87 MW
Alexandra Warehouse, Ravenhead Road, St Helens, WA10 3LR (13 components)

Crystal glass recycling facility. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.90 MW
ARDLEIGH-RIVER INTAKE PS, BY RIVER COLNE OP ROUSE WAY IPSWICH ROAD, CO4 0XB (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

Inactive • 2022-23 (T-1), 2021-22 (T-4)
1.48 MW
Asda Armadale, Armadale Station Station Road, Armadale, EH48 3ZZ (5 components)
• Load curtailment (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2021-22 (T-4) ...
0.20 MW
Asda Boston, Monument Road, Bicker, Lincolnshire PE20 3DJ (6 components)
• Load curtailment at site via standby generation (2)
• Load curtailment and standby generation
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
4.56 MW
Asda Boston, Pudding Lane Spalding, Lincs, PE11 3TJ (7 components)
• Load curtailment via standby generation (2)
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
14.05 MW
Asda Bournemouth, Portman House, Richmond Hill, Bournemouth, Dorset BH2 6EP (6 components)
• Mix of load curtailment and standby generation (2)
• Load curtailment and standby generation
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
4.56 MW
Asda Brierley Hill, Pedmore Road Brierley Hill West Midlands DY5 1LJ (9 components)

Load reduction (3)

Active • 2025-26 (T-4), 2022-23 (T-4) ...
8.13 MW
Asda Canterbury, Mill Lane, Chilham, Kent CT4 8EF (1 component)

Load drop

Inactive • 2021-22 (T-4)
2.16 MW
Loading map...
Showing 25 locations