Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

5 unique locations (30 components)

Asda Farnborough, Portsmouth Rd, Frimley, Surrey GU16 7UJ (7 components)
• 24.95 MW of Battery Storage located at Waterlooville.
• Load curtailment on site and standby generation
• Load curtailment via standby generation exporting excess
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Hungerford Farm, Winchfield, Hook RG27 8SW (2 components)

5.4 MW of battery storage units across different sites

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Hungerford Farm, Winchfield, Hook RG27 8SW (3 components)

5.4 MW of battery storage units across different sites

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land North of Clayhill Farm Westoning MK45 5JD (4 components)
• 6 MW Battery Storage facility located at Westoning.
• 6MW of demand reduction
• Load reduction on site supported by non-exporting standby generation.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (14 components)
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• 20MW battery storage site
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11.16 MW
Loading map...
Showing 5 locations