DSR (Demand Side Response)

6 unique locations (55 components)

Marks & Spencer - Stockley Park, 3 Longwalk Road, Stockley Park, Uxbridge, UB11 1AW (10 components)
• DSR Component providing load turn down at a retail store
• Import/Export metering with diesel generation at a retail store
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
5.19 MW
Castle Lane West BH8 9UP (10 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.03 MW
Asda Tunstall, Scotia Road ST6 6AT (8 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.16 MW
Asda Tunbridge Wells, Longfield Road , Tunbridge Wells, TN2 3EY (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
265.95 MW
Asda Maesteg, Castle Street, Maesteg, CF34 9UN (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.06 MW
Asda Leek, Meerbrook, Leek, Staffordshire, ST13 8TQ (5 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
1.63 MW
Loading map...
Showing 6 locations