Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

94 unique locations (995 components) - Page 1 of 4

1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (15 components)
• 2 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• A completed power plant, with associated civil works, switchgear and electrical connection.
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
7.90 MW
36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PE (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-4)
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (29 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• New build transmission connected battery storage site
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.90 MW
ARDLEIGH-RIVER INTAKE PS, BY RIVER COLNE OP ROUSE WAY IPSWICH ROAD, CO4 0XB (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-4)
Asda Northampton Thornton, Thorton Rd Kingsthorpe, Northampton, NN2 6LS (11 components)
• Gas fired reciprocating engines.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2023-24 (T-1) ...
13.36 MW
Asda Witham Highfields Road, Benfield Way Lakes Road Braintree CM7 3YS (10 components)
• CHP unit
• Load reduction.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.71 MW
BANKFIELD QUARRY, PIMLICO, CLITHEROE, LANCASHIRE, BB7 4QA (5 components)
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• Two gas CHP engines in commercial horticultural environment with no auxilliary load
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
BAYSTON HILL QUARRY, BAYSTON HILL, SHREWSBURY, SHROPSHIRE, SY3 0AW (6 components)
• A reciprocating gas engine CHP providing hot water to a local heating network
• Gas fuelled generation plant
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
BEDHAMPTON QUAY, HARTS FARM WAY, HAVANT, HAMPSHIRE, PO9 1JN (7 components)
• New build battery.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Berry Agile Solutions, Ellough Industrial Area, Ellough, Suffolk, NR34 7TB, UK (4 components)
• Gas fired generating units
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2024-25 (T-1), 2023-24 (T-4) ...
4.50 MW
BESTWOOD QUARRY, NOTTINGHAM ROAD A60, NOTTINGHAM, NOTTINGHAMSHIRE, NG15 8FL (7 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage).
• DSR Component providing load turn down at a manufacturing site
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Bicker Bar, Swineshead, Boston, Lincolnshire, PE20 3AN (5 components)
• A New Build 8MW Gas Fuelled Generating Station.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
BLOCK FEN QUARRY, CHATTERIS ROAD, MEPAL, ELY, CAMBRIDGESHIRE, CB6 2AY (8 components)
• EV charging at residential premises
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2026-27 (T-4), 2021-22 (T-4) ...
BOCKING - WW, CHURCH LANE, CM7 5SQ (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
25.11 MW
bournville place, Bournville Ln, Birmingham B30 2LU, UK (8 components)
• Component has yet to be procured.
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
BROOKSBY QUARRY, BROOKSBY QUARRY MELTON ROAD, BROOKSBY, LE14 2LJ (7 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• Pre-refurbishment generating unit 2
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
BUCKLESHAM RIVER INTAKE WA, MILL ROAD BUCKLESHAM, IP6 8LG (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-4)
BURNLEY WHARF, MARINE PARADE, SOUTHAMPTON, SO14 5JP (7 components)
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• The CMU is a coal-fired set in the Uskmouth power station. This is a mothballed set for which TEC may be sought. As the connection agreement shows, the site has the CEC to export to this quantity, but it will be a matter of securing TEC (of some form) if this set is to come back on the bars.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
21.54 MW
Cadney Carrs WPS 1, CADNEY CARRS WPS, Brigg Road, Cadney, BRIGG South Humberside, DN20 9HP, (7 components)
• A New Build 8MW Gas Fuelled Generating Station.
• The CMU Component reduces import demand by turning on back up generation.
Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
123.20 MW
Caister STW 2, CAISTER-PUMP LANE STW - HV, Pump Lane, off Caister by pass Caister On Sea, GREAT YARMOUTH Norfolk, NR30 5AJ (8 components)
• New build power station comprised of multiple reciprocating engines.
• The CMU Component reduces import demand by turning on back up generation.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
CAULDON LOW QUARRY, CAULDON, STOKE ON TRENT, STAFFORDSHIRE, ST10 3EW (8 components)
• EnerG 1000 CHP
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
21.54 MW
Centrica Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT. (26 components)
• 1 x hydro turbine & synchronous generator
• 4MW battery co-located with a solar farm
• Centrica Peterborough Power Station (PPS) is an Open Cycle Gas Turbine (OCGT) electricity generating station.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
650.00 MW
COLNEY WS, OLD WATTON ROAD COLNEY, NR4 7TW (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
25.11 MW
Component has yet to be procured (83 components)

Component has yet to be procured

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
DUSTON MILL-PITSFORD WA, DUSTON MILL RIVER INTAKE, NN5 6ER (19 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
39.68 MW
Loading map...
Showing 25 locations