Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

46 unique locations (752 components) - Page 1 of 2

Weighbridge Road, Shotton, Deeside, CH5 2LL (22 components)

Paper mill industrial site

Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (16 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
59.11 MW
Unit A, The Loddon Centre, Basingstoke, RG24 8QW (18 components)
• Gas reciprocating engine
• Peak power plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (18 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
• Reciprocating Engine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
58.74 MW
To be determined (111 components)

Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
141.16 MW
TA9 3QG (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA6 3JS (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA5 2AW (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA4 2UN (9 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA3 7PE (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA3 6PH (9 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA24 6PJ (9 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA23 0YA (9 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA15 6UT (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Staithes Road, Preston, Hull, HU12 8TB (31 components)
• CHP Unit
• CHP Unit Located at Staithes Road, Preston, Hull, HU12 8TB
• Gas fired CHP unit
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.31 MW
SP5 3EU (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
SP4 7BE (9 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
SN15 3QZ (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Runcorn site HQ, South Parade, PO Box 9, Runcorn, WA7 4JE (11 components)

Chemical manufacturer

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Ribblesdale Cement Works, West Bradford Road, Clitheroe, BB7 4QF (16 components)

Hanson 2 - DSR Turn Down/ Load Reduction

Active • 2024-25 (T-1), 2023-24 (T-4) ...
Rassau Industrial Estate, Ebbw Vale, Blaenau Gwent, NP23 5SD (11 components)

Peak power plant

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Northern Steel Stocks, Cross Street, Wolverhampton, WV1 2HS (14 components)
• Gas reciprocating engine
• Peak power plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
New Victoria Park, Grange Road, Glasgow, G42 9LF (20 components)

Generators at hospital site

Active • 2024-25 (T-1), 2023-24 (T-4) ...
Milton Keynes University Hospital Standing Way, Eaglestone, Milton Keynes, MK6 5LD (11 components)

Generator at the Hospital

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Milton Keynes Hospital NHS Trust, Standing Way, Eaglestone, Milton Keynes, MK6 5LD (17 components)

Behind the Meter Generation

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 25 locations