DSR (Demand Side Response)

9 unique locations (72 components)

Ribblesdale Works, West Bradford Road, Clitheroe, BB7 4QF (3 components)

Onsite demand reduction and load shifting at cement works

Inactive • 2020-21 (T-1)
Philip Dennis Foodservice Mullacott Cross Industrial Estate Ilfracombe Devon EX34 8PL (7 components)
• 0.261 MW of DSR
• N/A
• Water treatment centre
Inactive • 2022-23 (T-3), 2020-21 (T-1) ...
Padeswood Works, Chester Road, Padeswood, Mold, CH7 4HB (5 components)
• Energy from waste Facility
• Onsite demand reduction and load shifting at cement works
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Lots Road, Chelsea, London SE10 0QG (12 components)

Standby generation

Inactive • 2022-23 (T-1), 2021-22 (T-1) ...
Larport Farm Larport Lane Dormington Hereford HR1 4EP (9 components)
• 19.500 MW of battery storage located at Hereford.
• Nantwich Existing Site CHP
• Onsite load reduction and back up generation behind the meter on multiple sites
Active • 2027-28 (T-4), 2023-24 (T-4) ...
17.31 MW
Ketton Works, Ketton, Stamford, PE9 3SX (5 components)

Onsite demand reduction and load shifting at cement works

Inactive • 2021-22 (T-4), 2020-21 (T-1)
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (3 components)

1.000MW of battery storage located at Staffordshire.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Cold Harbour Lane, Rainham, RM13 9YB (17 components)
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
• Plastics recycling facility located next to material recycling facility comprising several DSR loads: belts, cranes.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
4 Finway Road Hemel Hempstead HP2 7PT (11 components)
• 14.710 MW CHP generation
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
• Onsite load reduction and back up generation behind the meter on multiple sites
Active • 2024-25 (T-4), 2022-23 (T-3) ...
4.76 MW
Loading map...
Showing 9 locations