Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

79 unique locations (326 components) - Page 1 of 4

Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (4 components)
• 1 MW of demand reduction
• 1MW of demand reduction
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (2 components)
• 1 MW of demand reduction
• 1MW of demand reduction
Inactive • 2019-20 (T-1), 2018-19 (T-1)
UPM Shotton Weighbridge Road Shotton Deeside CH5 2LL (5 components)

19 MW of demand reduction

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
UPM Shotton Weighbridge Road Shotton Deeside CH5 2LL (1 component)

19 MW of demand reduction

DSR LIMEJUMP LTD Conditional
Inactive • 2019-20 (T-1)
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HX (6 components)
• 5 MW of demand reduction
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Twin Oaks Farm Land East of Yelt Farm Lower Street Doveridge DE6 5JW (3 components)

5 MW of demand reduction

DSR LIMEJUMP LTD Conditional DE6
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Twin Oaks Farm Land East of Yelt Farm Lower Street Doveridge DE6 5JW (1 component)

5 MW of demand reduction

DSR LIMEJUMP LTD Conditional
Inactive • 2019-20 (T-1)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (10 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (3 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Inactive • 2021-22 (T-1), 2019-20 (T-1) ...
The Leys, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (9 components)
• 0.8 MW of demand reduction
• 800kW/1100kWh Lithium Ion Battery
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Slepe Farm Dorchester Road Lytchett Minster Pool Dorset BH16 6HS (10 components)
• 0.250 MW of demand reduction
• 2MW of DSR
• DSR turn down
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Slepe Farm Dorchester Road Lytchett Minster Pool Dorset BH16 6HS (2 components)
• 0.250 MW of demand reduction
• 2MW of DSR
Inactive • 2020-21 (T-1), 2019-20 (T-1)
Seamer Carr Landfill Seamer Scarborough YO12 4QA (5 components)
• 3 MW of DSR
• 3 MW of demand reduction
• 3MW Battery Storage facility located at Scarborough
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Seamer Carr Landfill Seamer Scarborough YO12 4QA (2 components)
• 3 MW of DSR
• 3 MW of demand reduction
Inactive • 2020-21 (T-1), 2019-20 (T-1)
Riverside Crossgate Drive Queens Drive Industrial Estate NG2 1LW (2 components)

5 MW of demand reduction

DSR LIMEJUMP LTD Conditional NG2
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Riverside Crossgate Drive Queens Drive Industrial Estate NG2 1LW (1 component)

5 MW of demand reduction

DSR LIMEJUMP LTD Conditional
Inactive • 2019-20 (T-1)
RIDING MILL PUMPING STATION Riding Mill NE43 7UA (3 components)

1.6MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
RIDING MILL PUMPING STATION Riding Mill NE43 7UA (1 component)

1.6MW of demand reduction

Inactive • 2019-20 (T-1)
Recycling Lives Recycling Park Longridge Road Preston Lancashire PR2 5BX (3 components)

2 MW demand reduction

DSR LIMEJUMP LTD Rejected PR2
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Recycling Lives Recycling Park Longridge Road Preston Lancashire PR2 5BX (1 component)

2 MW demand reduction

DSR LIMEJUMP LTD Rejected
Inactive • 2019-20 (T-1)
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (6 components)
• 0.500MW Battery Energy Storage System
• 0.5MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
PORK FARMS LIMITED, CROSSGATE DRIVE, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 1LW (3 components)

0.18 MW of Demand Reduction

DSR LIMEJUMP LTD Conditional NG2
Inactive • 2022-23 (T-4), 2019-20 (T-1)
PORK FARMS CASPIAN LTD, STERTE AVENUE, POOLE, DORSET, BH15 2AS (3 components)

0.36MW of demand reduction

DSR LIMEJUMP LTD Conditional BH15
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Poplars, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (9 components)
• 1 MW of demand reduction
• 1000kW/1200kWh Lithium Ion Battery
• 1MW Lithium Ion Battery
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Philip Dennis Foodservice Roundswell Business Park Barnstaple Devon EX31 3TD (5 components)
• 3.75 MW storage battery located in Devon
• 3.750 MW of demand reduction
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 25 locations