DSR (Demand Side Response)

20 unique locations (78 components)

2 Whitehouse Way, Peterlee, County Durham, SR8 2RA (5 components)

3 MW of demand reduction (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
12.64 MW
Addo Food Group Fulney Lane Spalding Lincolnshire PE12 6EZ (1 component)

4 MW of demand reduction

Inactive • 2019-20 (T-1)
1.69 MW
Addo Food Group Fulney Lane Spalding Lincolnshire PE12 6EZ (2 components)

4 MW of demand reduction (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
3.37 MW
ADDO FOOD GROUP, FULNEY LANE, SPALDING, LINCOLNSHIRE, PE12 6EZ (3 components)

0.27MW of demand reduction (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
0.56 MW
Barrasford Pumping Station Barrasford Hexham NE46 4AY (3 components)
• 0.6MW of turn down
• 4MW of DSR
• Turn down component
Inactive • 2022-23 (T-3), 2019-20 (T-1) ...
Barrasford Pumping Station Barrasford Hexham NE46 4AY (6 components)
• 0.6MW of turn down
• 4MW of DSR
• Turn down component
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
BREACH FARM, CADLEY LANE, SWADLINCOTE, DERBYSHIRE, DE12 6RJ (5 components)

10 MW demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (3 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Inactive • 2021-22 (T-1), 2019-20 (T-1) ...
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (9 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Calgarth PS Old Hall Road Windermere LA23 1JA (1 component)

5 MW of demand reduction

Inactive • 2019-20 (T-1)
Calgarth PS Old Hall Road Windermere LA23 1JA (3 components)

5 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
CALGARTH PS, WINDERMERE, CUMBRIA, LA23 (3 components)

0.2MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
CHILTERN COLD STORAGE, CHILTERN HOUSE, SHREWSBURY AVENUE, PETERBOROUGH, CAMBRIDGESHIRE, PE2 7LB (3 components)

03MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (10 components)
• 0.250MW Battery Energy Storage System
• 0.25MW of Demand Reduction
• 5MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Commerical Road, Wolverhampton, WV1 3RD (4 components)

5 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Ervin Amasteel 11KV connection George Henry Road Breat Bridge Tipton West Midlands DY4 7BZ (2 components)
• 0.4MW demand reduction
• Turn down of 11kv connection
Inactive • 2019-20 (T-1), 2017-18 (TR)
Ervin Amasteel 11KV connection George Henry Road Breat Bridge Tipton West Midlands DY4 7BZ (5 components)
• 0.4MW demand reduction
• Turn down of 11kv connection
Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Ervin Amasteel 33KV connection George Henry Road Breat Bridge Tipton West Midlands DY4 7BZ (2 components)
• 2.6MW of demand reduction
• Turn down CMU
Inactive • 2019-20 (T-1), 2017-18 (TR)
Ervin Amasteel 33KV connection George Henry Road Breat Bridge Tipton West Midlands DY4 7BZ (4 components)
• 2.6MW of demand reduction
• Turn down CMU
Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Essex & Suffolk Water PLC Pumping Station No 1 Feeder 1 Hatfield Road Langford Chelmsford Essex, CM9 6QA (4 components)

3 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Loading map...
Showing 20 locations