DSR (Demand Side Response)

5 unique locations (124 components)

to be provided once CMU Components are known (91 components)
• Aggregated Generation - Diesel
• The CMU component is an aggregation of turn-down and onsite generation
• to be provided once CMU Components are known
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
91.69 MW
TA9 3QG (11 components)
• N/A
• Water treatment centre
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Substation at Saltend Lane Preston East Riding of Yorkshire HU12 8EY (6 components)
• N/A
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Asda Brierley Hill, Pedmore Road Brierley Hill West Midlands DY5 1LJ (9 components)
• Gas CHP engines in commercial horticultural usage with no auxilliary load
• Load reduction
• N/A
Active • 2025-26 (T-4), 2022-23 (T-3) ...
1.02 MW
88 Coventry Road Broughton Astley Leicester LE9 6QA (7 components)
• 2.52MW Battery Storage located at PepsiCo Leicester factory
• N/A
• New build power station comprised of multiple reciprocating engines.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 5 locations