DSR (Demand Side Response)

41 unique locations (669 components) - Page 1 of 2

Weighbridge Road, Shotton, Deeside, CH5 2LL (22 components)

Paper mill industrial site

Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (16 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
59.11 MW
Unit A, The Loddon Centre, Basingstoke, RG24 8QW (18 components)
• Gas reciprocating engine
• Peak power plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (18 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
• Reciprocating Engine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
58.74 MW
To be determined (111 components)

Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
141.16 MW
TA9 3QG (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA6 3JS (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA5 2AW (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA4 2UN (9 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA3 7PE (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA3 6PH (9 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA24 6PJ (9 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA23 0YA (9 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA15 6UT (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
SP5 3EU (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
SP4 7BE (9 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
SN15 3QZ (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Ribblesdale Cement Works, West Bradford Road, Clitheroe, BB7 4QF (16 components)

Hanson 2 - DSR Turn Down/ Load Reduction

Active • 2024-25 (T-1), 2023-24 (T-4) ...
New Victoria Park, Grange Road, Glasgow, G42 9LF (20 components)

Generators at hospital site

Active • 2024-25 (T-1), 2023-24 (T-4) ...
Milton Keynes Hospital NHS Trust, Standing Way, Eaglestone, Milton Keynes, MK6 5LD (17 components)

Behind the Meter Generation

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Lochaber Smelter Fort William Scotland PH33 6TH (17 components)

Furnaces

Active • 2024-25 (T-1), 2023-24 (T-4) ...
Lochaber Smelter Fort William Scotland PH33 6TH (9 components)
• Furnace
• Furnaces
Active • 2025-26 (T-1), 2023-24 (T-1) ...
DT6 4EP (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
DT5 1BA (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
DT4 9AX (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...