Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

400 unique locations (3167 components) - Page 3 of 16

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Station Road, Wigton, Cumbria CA7 9BG (20 components)
• Gas engine (2)
• Gas turbine
CHP and autogeneration Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU16 GCMU16 +10 more CA7
Active • 2025-26 (T-4), 2024-25 (T-4) ...
19.23 MW
Station Road, Chartham, Kent, CT4 7JA (1 component)

Generating Plant located at Station Road, Chartham, Kent, CT4 7JA

Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU AW Chartham CT4
Inactive • 2021-22 (T-4)
Station Road, Burton Latimer, KEttering, Northants, NN15 5JR (3 components)

CHP

CHP and autogeneration Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU Weetabix Rejected NN15
Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Stanlow Manufacturing Complex, Ellesmere Port, Cheshire, CH65 4HB (3 components)
• 2 x On-site turbo alternators
• 6 x On-site turbo alternators
• Power Recovery Train
Inactive • 2019-20 (T-1)
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (10 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Aggregated CE_Aggregated +4 more E3
Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.53 MW
Staithes Road, Preston, Hull, HU12 8TB (18 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2029-30 (T-4), 2028-29 (T-4) ...
5.49 MW
Staithes Road, Preston, East Riding of Yorkshire HU12 8TB (4 components)

On-Site Generating CMU.

Active • 2029-30 (T-4), 2026-27 (T-1) ...
5.89 MW
Stainland Boardmill, Holywell Green, Halifax, HX4 9PY (3 components)

Gas Fired CHP (3)

Combined Heat and Power (CHP) E.ON UK PLC New Build Generating CMU SON_CHP SON_CHP HX4
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.78 MW
Speke Operations, Fleming Rd, Liverpool L24 9LN (7 components)
• 2 x gas turbines with a total rated gross power capacity of 6.830 MW and total net power capacity of 6.807 (2)
• Speke combined heat and power plant.
CHP and autogeneration Combined Heat and Power (CHP) VEOLIA UK LIMITED Existing Generating CMU SPEKE CHP SPEKE CHP L24
Active • 2029-30 (T-4), 2026-27 (T-1) ...
15.77 MW
Speke Blvd, Speke, Liverpool L24 9LE (3 components)
• on site generating CMU (2)
• On-site Generating CMU
Active • 2025-26 (T-1), 2024-25 (T-1) ...
9.61 MW
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (11 components)

Existing Generation on existing site - CHP (3)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected WV15
Active • 2029-30 (T-4), 2027-28 (T-4) ...
24.61 MW
Southport & Formby District General Hospital, Town Lane Kew, Southport PR8 6PN (6 components)

1 x gas reciprocating engine with a total rated gross power capacity of 0.995 MW and a net power capacity of 0.961 MW (2)

CHP and autogeneration Combined Heat and Power (CHP) VEOLIA UK LIMITED Existing Generating CMU Ormskirk, Southport & North Devon Hospitals PR8
Active • 2029-30 (T-4), 2028-29 (T-4) ...
3.53 MW
Southport and Formby District General Hospital, Town Lane, Kew, Southport, Merseyside, PR8 6PN (2 components)

1 x Gas reciprocating engines with a total rated gross power capacity of 1.008 MW (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
South Kensington Campus, London, SW7 2AZ (4 components)
• One of two, 4.5MW CHP engines at Imperial Collage London (2)
• One of two, 4.5MW CHP engines located at Imperial College London
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Southend University Hospital NHS Foundation, Trust Prittlewell Chase, Southend-on-Sea, Westcliff on-Sea, SS0 0RY (2 components)

Gas fired CHP unit (2)

Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG58 SS0
Inactive • 2022-23 (T-1), 2021-22 (T-1)
Southdownview Way, Worthing, West Sussex, BN14 8QH (8 components)

CHP and autogeneration (3)

Combined Heat and Power (CHP) CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Existing Generating CMU 6RES1D-WR GSK Irvine, Worthing +1 more BN14
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Southampton General Hospital, Tremona Road, Southampton SO16 6YD (14 components)

The Hospital has an Energy Center with electricity generating units and surplus power is exported to the grid.

Active • 2029-30 (T-4), 2028-29 (T-4) ...
20.78 MW
Solvay, Trinity St, Oldbury, B69 4LW (6 components)

Existing Generation on existing site - CHP (3)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected B69
Active • 2027-28 (T-4), 2026-27 (T-4) ...
6.46 MW
Solenis UK Industries Limited, Cleckheaton Road, Low Moor, Bradford, West Yorkshire, BD12 0JZ (6 components)
• CHP Tornado SGT-200 6.4MWh (2)
• CHP Typhoon SGT-100 4.7MWh
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Solenis, Cleckheaton Road, Low Moor, Bradford, United Kingdom, BD12 0JZ (11 components)

Gas Turbine CHP unit (3)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENX42 GENX42 +2 more BD12
Active • 2025-26 (T-4), 2024-25 (T-1) ...
10.17 MW
SO45 1TX (3 components)
• TG1B is part of the aggregated CMU EM3-21, which is made up of 3 Generating Units of which TG1B of medium size. This Generating Unit is embedded in the E_FAWND BMU and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power and steam generation units on site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU - Unit 3).
• Unit 3 is part of the aggregated CMU EM3-21, which is made up of 3 Generating Units of which Unit 3 is the smallest. This Generating Unit is embedded in the E_FAWND BMU and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 3 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU - TG1B).
• Unit 5 is part of the aggregated CMU EM3-21, which made up of 3 Generating Units of which Unit 5 is the largest. This Generating Unit forms the E_FAWN-1 BMU on its own and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (MSID 7081). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW.
CHP and autogeneration ESSO PETROLEUM COMPANY,LIMITED Existing Generating CMU EPCo Fawley CMU SO45
Inactive • 2021-22 (T-4)
Snodland Paper Mill, Mill Street, Snodland, Kent, ME6 5AX (5 components)

On-site Generating CMU. (3)

Active • 2029-30 (T-4), 2028-29 (T-4) ...
47.28 MW
Smurfit Kappa Townsend Hook, Snodland, Kent, ME6 5AX (2 components)

10.754 MW CHP Plant with 2 new Gas Turbines (2)

CHP and autogeneration LIMEJUMP LTD Townsend Hook Not Prequalified ME6
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Smurfit Kappa Townsend Hook, Mill Street, Snodland, Kent, ME6 5AX (5 components)
• 5.2MWe CHP gas turbine (2)
• GT2 CHP unit rated at 5.2MW
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham, B7 5RE (13 components)
• 1 x 3.5MW natural gas fired turbine + 1 x 4.8MW natural gas fired turbine
• 8.300MW Gas Turbine installation
• 8.3MW Gas Turbine installation
Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.58 MW
Loading map...
Showing 25 locations