Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

314 unique locations (2726 components) - Page 2 of 13

Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
TOTAL LINDSEY OIL REFINERY LTD, EASTFIELD ROAD, NORTH KILLINGHOLME, IMMINGHAM, DN40 3LW (6 components) Geocoding Needed
• On-Site Generating CMU.
• On-Site Generating Steam Turbine, utilising heat recovery waste as a 'fuel input' and generating electricity w/o fossil fuel emissions.
• On-Site Generating Steam Turbine, utilising high pressure steam waste from on-site refinery processes as a 'fuel input' and generating electricity w/o fossil fuel emissions.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
90.46 MW
T&L Sugars Limited, Thames Refinery, Factory Road, Silvertown, London, United Kingdom, E16 2EW (19 components) Geocoding Needed
• No2 Steam turbine - Allen Steam Turbines/NG Model MB510 - 2009 - Nominal power rating 14500kWe
• No5 Gas Turbine - European Gas Turbines SGT200 'Tornado' - S765/01 1997 - Nominal power output 6000kWe
DSR Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU XGEN24 XGEN24 +6 more E16
Active • 2025-26 (T-4), 2023-24 (T-4) ...
63.21 MW
Thirsk Factory, Dalton Airfield, Topcliffe, Thirsk, YO7 3HE. (5 components) Geocoding Needed

1.280MW CHP

Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.65 MW
The Royal Marsden NHS Foundation Trust, Downs Road, Sutton, SM2 5PT (4 components) Geocoding Needed
• CHP
• Gas Fired - CHP
CHP and autogeneration Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG33 KPEG33 +1 more SM2
Active • 2024-25 (T-1), 2023-24 (T-4) ...
7.37 MW
The Ridgeway, Enfield, Middlesex, EN2 8JL (10 components) Geocoding Needed
• On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980
• On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980
Active • 2027-28 (T-4), 2026-27 (T-4) ...
5.74 MW
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (11 components) Geocoding Needed
• Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three engines of 2.65MW each all CHP engine in a horticultural environment, exporting excess generation to distribution network. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2025-26 (T-4) ...
36.70 MW
The Heat Station, Harbour Parade, Southampton, Hampshire, SO15 1BA (24 components) Geocoding Needed
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
Active • 2025-26 (T-4), 2025-26 (T-1) ...
28.00 MW
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (10 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks (2)
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
9.91 MW
The fields close to Chear Farm Bungalow, Ely Road, Chittering, Cambridge, CB25 9PN (2 components) Geocoding Needed
• FENGEN (CMU) is a load reduction asset using lighting and battery energy storage (BESS) for growing of vegetables on an industrial scale.
• FENGH2 (CMU) is a new build generating 06.000MW gas fired CHP plant.
DSR Combined Heat and Power (CHP) WATTS FARM SOLAR LIMITED Unproven DSR CMU New Build Generating CMU CB25
Active • 2028-29 (T-4)
6.46 MW
The Christie Hospital, Wilmslow Road, Manchester, M20 4BX (1 component) Geocoding Needed

VIT43A - CHP unit at The Christie Hospital, Wilmslow Road, Manchester, M20 4BX

Active • 2025-26 (T-4)
2.41 MW
Thearne Lane, Woodmansey, Beverley, North Humberside, HU17 0SA (3 components) Geocoding Needed

2 x CHP at a horticultural site

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX167 HU17
Active • 2028-29 (T-4), 2025-26 (T-4) ...
3.88 MW
Thearne Lane Woodmansey Beverley HU17 0SA (7 components) Geocoding Needed
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Two gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
6.90 MW
Thearne Lane Woodmansey Beverley HU17 0SA (7 components)
• Two gas CHP engines in commercial horticultural environment with no auxilliary load (2)
• Gas CHP engines in commercial horticultural environment with no auxilliary load
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX14 FLEX14 +2 more HU17
Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.05 MW
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (10 components) Geocoding Needed
• CHP engine in horticultural environment with no auxilliary load
• Two CHP engines in horticultural environment with no auxilliary load
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX02 FLEX02 +2 more CT7
Active • 2028-29 (T-4), 2025-26 (T-4) ...
24.41 MW
Telford Dairy Limited, Donnington Wood Business Park, Telford, Shropshire, TF2 7GJ (4 components) Geocoding Needed

On-Site Generating CMU

Active • 2028-29 (T-4), 2025-26 (T-4) ...
7.37 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (21 components) Geocoding Needed
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
40.32 MW
Taw Valley Creamery, South Weeke, North Tawton, Devon, England, EX20 2DA (4 components) Geocoding Needed

CHP unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENZ02 GENZ02 +1 more EX20
Active • 2025-26 (T-4), 2024-25 (T-4) ...
5.34 MW
Syensqo Oldbury, Trinity St, Oldbury, B69 4LN (1 component) Geocoding Needed

Existing Generation on existing site - CHP

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU GBD048 / GB2548 B69
Active • 2025-26 (T-4)
Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (6 components) Geocoding Needed
• Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposes
• Two gas CHP engines 1.54MW. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2025-26 (T-4) ...
6.29 MW
Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (6 components)

Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposes (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
2.89 MW
Stoneykirk Road, Stranraer, DG9 7BU (9 components) Geocoding Needed
• CHP unit
• Gas fired CHP unit
CHP and autogeneration Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU Base Power KPEG72 DG9
Active • 2024-25 (T-1), 2023-24 (T-1) ...
15.77 MW
St Marks Boilerhouse, Donaldson Road, LEICESTER, Leicestershire LE4 6BF (13 components) Geocoding Needed

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.88 MW
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (4 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the … (3)

Active • 2025-26 (T-1), 2019-20 (T-1) ...
1.35 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (10 components) Geocoding Needed

Turbomach M50 Natural Gas fired CHP unit

CHP and autogeneration Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU07 GCMU07 +4 more BA14
Active • 2024-25 (T-4), 2023-24 (T-1) ...
26.96 MW
Staverton, Trowbridge, BA14 6PG (1 component) Geocoding Needed

Turbomach M50 Natural Gas fired CHP unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU07 BA14
Active • 2025-26 (T-1)
4.47 MW
Loading map...
Showing 25 locations