Active MW: 17008.53 MW
Inactive MW: 492.25 MW
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (9 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used. (2)
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP) P3P ENERGY MANAGEMENT AE LIMITED Existing Generating CMU Woodhouse Energy Centre Woodhouse Energy Centre +3 more SK9
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.23 MW
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (18 components)
• 2MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
• One 2MW gas CHP engine in a horticultural environment
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX110 FLEX110 +5 more WA16
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11.39 MW
Wissington Sugar Factory British Sugar plc College Road Wissington King's Lynn PE33 9QG (12 components)

The CMU is a gas fired CCGT CHP (3)

CHP and autogeneration Combined Heat and Power (CHP) BRITISH SUGAR PLC Existing Generating CMU Wissington CHP Wissington CHP +8 more PE33
Active • 2028-29 (T-4), 2027-28 (T-4) ...
125.98 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (25 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (2)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
119.61 MW
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (12 components)

One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load. (3)

CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX110 FLEX110 +2 more WR11
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.74 MW
Westexe, Tiverton, Devon, EX16 5LL (6 components)

2026 kW CHP unit (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.65 MW
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (6 components)

Existing Generation on existing site - CHP (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
36.30 MW
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (6 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Aggregated 3 CE_Aggregated 3 +1 more HA9
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.06 MW
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (11 components)

Warrington Existing Site CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.17 MW
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (9 components)
• Gas fired CHP unit (2)
• Gas CHP in St. Austell
Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG55 Rejected PL26
Active • 2026-27 (T-4), 2025-26 (T-4) ...
6.12 MW
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (10 components)

Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations (3)

Active • 2028-29 (T-4), 2026-27 (T-4) ...
5.59 MW
Thirsk Factory, Dalton Airfield, Topcliffe, Thirsk, YO7 3HE. (5 components)

1.280MW CHP (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
2.34 MW
The Ridgeway Enfield, Middlesex EN2 8JL (8 components)

On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980 (3)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU GBD010 Rejected EN2
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.03 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (15 components)

The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year. (3)

Reciprocating Engines Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP) SPARK STEAM LIMITED Existing Generating CMU Spark Steam Energy Centre Spark Steam Energy Centre +3 more TS23
Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.39 MW
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (9 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Aggregated CE_Aggregated +4 more E3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.38 MW
Staithes Road, Preston, Hull, HU12 8TB (17 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.49 MW
Stainland Boardmill, Holywell Green, Halifax, HX4 9PY (3 components)

Gas Fired CHP (3)

Combined Heat and Power (CHP) E.ON UK PLC New Build Generating CMU SON_CHP SON_CHP HX4
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.78 MW
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (10 components)

Existing Generation on existing site - CHP (3)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected WV15
Active • 2027-28 (T-4), 2026-27 (T-4) ...
19.72 MW
Solvay, Trinity St, Oldbury, B69 4LW (6 components)

Existing Generation on existing site - CHP (3)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected B69
Active • 2027-28 (T-4), 2026-27 (T-4) ...
6.46 MW
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (10 components)

CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site. (3)

CHP and autogeneration Combined Heat and Power (CHP) Sembcorp Utilities (UK) Limited Existing Generating CMU Sembcorp Wilton GT2 Sembcorp Wilton GT2 +8 more Rejected TS90
Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.40 MW
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (19 components)

(Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT and Steam Turbine in CHP Configuration within the (former ICI) … (3)

CHP and autogeneration Combined Heat and Power (CHP) Sembcorp Utilities (UK) Limited Existing Generating CMU Sembcorp Wilton GT1 Sembcorp Wilton GT1 +17 more Rejected TS90
Active • 2028-29 (T-4), 2027-28 (T-4) ...
184.43 MW
School Road, Aberdeen AB24 1TU (13 components)

District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations. (3)

DSR CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX24 FLEX24 Rejected AB24
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.22 MW
Samworth Brothers, 81-83 Tavistock Road, Callington, Cornwall, PL17 7TA (11 components)

Callington - Existing Site CHP unit (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.27 MW
Saltend Power Station Saltend Hull HU12 8GA (30 components)
• Unit 1 at Saltend Power Station
• Unit 2 at Saltend Power Station
• Unit 3 at Saltend Power Station
CHP and autogeneration Combined Heat and Power (CHP) SALTEND COGENERATION COMPANY LIMITED Existing Generating CMU Saltend Unit 1 Saltend Unit 1 +26 more HU12
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3107.85 MW
Saddlebow Industrial Estate, Poplar Avenue, King's Lynn PE34 3AL. (11 components)

Power Station for Paper plant made up of 1x35MW Gas engine plus 1x12MW steam turbine (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
41.29 MW