Combined Heat and Power (CHP)

10 unique locations (138 components)

Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (21 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
DSR Combined Heat and Power (CHP) GRIDBEYOND LIMITED Proven DSR CMU Endeco Technologies CMU1 DN16
Active • 2028-29 (T-4), 2027-28 (T-4) ...
42.08 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA (24 components)
• existing CHP on site.
• existing on site CHP
• existing onsite CHP
Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected DN16
Active • 2027-28 (T-4), 2026-27 (T-4) ...
149.20 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA. (24 components)
• existing on site CHP (2)
• existing onsite CHP
Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected DN16
Active • 2027-28 (T-4), 2026-27 (T-4) ...
149.20 MW
Pond Street London NW3 2QG (12 components)
Active • 2029-30 (T-4), 2027-28 (T-4) ...
15.41 MW
Pond Street, London, NW3 2QG (12 components)

On-site CHP - existing generating unit Pond Street London OS Grid Reference: TQ 272 854 NW3 2QG

Active • 2029-30 (T-4), 2027-28 (T-4) ...
15.41 MW
Solvay, Trinity St, Oldbury, B69 4LW (6 components)

Existing Generation on existing site - CHP (3)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected B69
Active • 2027-28 (T-4), 2026-27 (T-4) ...
6.46 MW
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (11 components)

Existing Generation on existing site - CHP (3)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected WV15
Active • 2029-30 (T-4), 2027-28 (T-4) ...
24.61 MW
The Ridgeway Enfield, Middlesex EN2 8JL (12 components)
Active • 2029-30 (T-4), 2027-28 (T-4) ...
3.88 MW
The Ridgeway, Enfield, Middlesex, EN2 8JL (10 components)

On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980 (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.03 MW
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (6 components)

Existing Generation on existing site - CHP (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
36.30 MW