Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

71 unique locations (637 components) - Page 1 of 3

Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
17 Oak Tree Road, Fen Drayton, Cambridge, CB24 4SS (6 components)

2 x gas fired CHP generators located at a horticultural site.

Active • 2029-30 (T-4), 2028-29 (T-4) ...
10.91 MW
5 Coulman St, Thorne, Doncaster DN8 5JT (3 components)
• On-Site Generating CMU
• new build on site generating CMU
Combined Heat and Power (CHP) GRIDBEYOND LIMITED New Build Generating CMU On-Site Energy - Chesterfield Poultry DN8
Active • 2027-28 (T-4), 2026-27 (T-1) ...
2.75 MW
96 Kings Rd, Immingham DN40 1QS (3 components)
• Existing Generating CHP
• New-Build CHP Generating Unit at Knauf (UK) Immingham Plant.
Combined Heat and Power (CHP) GRIDBEYOND LIMITED New Build Generating CMU GB2502 DN40
Active • 2028-29 (T-4), 2026-27 (T-1) ...
6.77 MW
9 Handyside St, Kings Cross, London N1C 4BH (12 components)

Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.

Active • 2027-28 (T-4), 2026-27 (T-1) ...
7.00 MW
Address: Port of Liverpool CHP, Regent Road, Bootle, Liverpool, L20 1ED (12 components)

Gas fired CHP

Combined Heat and Power (CHP) CARGILL PLC Existing Generating CMU POL CHP POL CHP +2 more L20
Active • 2029-30 (T-4), 2026-27 (T-1) ...
55.81 MW
Alderley Park Limited, Alderley Park, Congleton Road, Nether Alderley, Macclesfield, SK10 4TF. (3 components)

1 X gas engine with a gross capacity of 5.400 MW at MCR and ISO conditions

Combined Heat and Power (CHP) VEOLIA UK LIMITED Existing Generating CMU Alderley Park Limited SK10
Active • 2029-30 (T-4), 2026-27 (T-1) ...
12.29 MW
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (30 components)
• !MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW. The generator sizes have been inserted pro rata to achieve the overall CMU capacity of 2.891 MW as per the average of 3 net output peaks.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.12 MW
Bar Ln, Boroughbridge, Roecliffe, York YO51 9NN (6 components)

on site generating CMU

Active • 2029-30 (T-4), 2027-28 (T-4) ...
8.97 MW
Barrow Man Road Birchington Kent CT7 0AX (13 components)
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX03 FLEX03 +2 more CT7
Active • 2029-30 (T-4), 2028-29 (T-4) ...
14.40 MW
Barrow Man Road Birchington Kent CT7 0AX (13 components)
• Two CHP engines in horticultural environment with no auxilliary load
• Two 2.7MW CHP engines. Primary fuel type = Natural Gas
• Two 3.3 MW CHP gas engines. Primary fuel type = Natural Gas
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX03 FLEX03 +3 more CT7
Active • 2029-30 (T-4), 2028-29 (T-4) ...
14.40 MW
BATTERSEA POWER STATION, LONDON, SW11 8AH (4 components)
• Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the overall CMU capacity of 3.860 MW as per the average output of 3 nominated peaks.
• Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the overall CMU capacity of 3.860 MW as per the average output of 3 nominated peaks..
Active • 2029-30 (T-4), 2026-27 (T-1)
7.01 MW
Belliver Way, Roborough, Plymouth, PL6 7BP (12 components)
• 2025 KW gas fire engine
• 2025kW gas engine
Active • 2029-30 (T-4), 2028-29 (T-4) ...
18.43 MW
Belliver Way, Roborough, Plymouth, PL6 7BP (12 components)
Active • 2029-30 (T-4), 2028-29 (T-4) ...
18.43 MW
Cashmere Works, Birksland Street, Bradford, West Yorkshire, BD3 9SX (5 components)

On-Site Generating CMU

Active • 2029-30 (T-4), 2028-29 (T-4) ...
6.75 MW
Chryston, Moodiesburn, Glasgow G69 0JE (5 components)

On-site Generating CMU.

Active • 2029-30 (T-4), 2028-29 (T-4) ...
8.19 MW
Clay Wheels Ln, Wadsley Bridge S6 1LY (3 components)
• On-Site Generating CMU
• new build on site generating CMU
Active • 2027-28 (T-4), 2026-27 (T-1) ...
3.69 MW
Clough Green, Cawthorne, Barnsley, S75 4AD (5 components)

On-site Generating CMU.

Active • 2029-30 (T-4), 2026-27 (T-1) ...
3.76 MW
Donaldsons Nursery, Vinnetrow Road, Runcton, Chichester PO20 1QD (3 components)

Existing Generating CHP

Active • 2029-30 (T-4), 2026-27 (T-1) ...
4.18 MW
Drakemyre, Dalry KA24 5JJ (18 components)
• Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX25 FLEX25 +3 more KA24
Active • 2028-29 (T-4), 2026-27 (T-4) ...
66.09 MW
Dunswell Lane, Cottingham, Hull HU16 4JT (4 components)
• 1 x 1,067kW gas fired CHP at a horticultural site. Maximum Export capacity of connection agreement is 1,400MW.
• 1 x 1,400kW gas fired CHP at a horticultural site. Maximum Export capacity of connection agreement is 1,400MW.
Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX168 HU16
Active • 2029-30 (T-4), 2028-29 (T-4) ...
3.84 MW
Ellifoot Lane, Burstwick, HU12 9EB (7 components)
• A Distribution Connected 4.4MW gas fueled generating station
• A Distribution Connected 4.5MW gas fueled generating station
• a Combined Heat and Power Plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
34.29 MW
Estates & Facilities, North Devon District Hospital, Raleigh Park, Barnstaple, EX31 4JB (4 components)

1 x gas reciprocating engine with a total rated gross power capacity of 0.800 MW

Combined Heat and Power (CHP) VEOLIA UK LIMITED Existing Generating CMU Ormskirk, Southport & North Devon Hospitals EX31
Active • 2029-30 (T-4), 2028-29 (T-4) ...
2.89 MW
Fielding & Johnson Building, University Of Leicester, University Road, LEICESTER, Leicestershire LE1 7RH (28 components)
• Combined Heat and Power Plant, University of Leicester, capacity of generator 1.600MW
• Combined Heat and Power Plant, University of Leicester, capacity of generator 1.600MW. The generator sizes have been inserted pro rata to achieve the overall CMU capacity of 4.423 MW as per the average of 3 net output peaks.
• Combined Heat and Power Plant, University of Leicester, generator's capacity 1.600MW
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.83 MW
Loading map...
Showing 25 locations