Combined Heat and Power (CHP)

195 unique locations (2014 components) - Page 1 of 8

Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
100 Montifichet Road, Westfield, Stratford, E20 1GR (32 components) Geocoding Needed

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
36.18 MW
17 Oak Tree Road, Fen Drayton, Cambridge, CB24 4SS (4 components) Geocoding Needed

2 x gas fired CHP generators located at a horticultural site.

Active • 2028-29 (T-4), 2025-26 (T-4) ...
6.82 MW
1 Thane Road West, Nottingham, NG2 3AA (36 components) Geocoding Needed
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
98.44 MW
24-25 Eastern Way, Bury St Edmunds, IP32 7AD (12 components) Geocoding Needed

CHP Unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU ZGEN12 ZGEN12 IP32
Active • 2025-26 (T-4), 2024-25 (T-4) ...
9.28 MW
2 Engineers Way, Wembley, Middlesex, HA9 0JS (7 components) Geocoding Needed

Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX153 HA9
Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.67 MW
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (9 components) Geocoding Needed
• District heating implementation of two gas CHP engines with no auxilliary load
• Two 3.0 MW gas CHP engines. Primary fuel type = Natural Gas
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX05 FLEX05 +1 more MK9
Active • 2026-27 (T-4), 2025-26 (T-4) ...
20.78 MW
3 Fountain Drive, Inchinnan Business Park, Paisley, PA4 9RF. (5 components) Geocoding Needed

MTU - 8V400064 1.013MW

Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.17 MW
46 Station Road Stokesley Middlesbrough TS9 7AA (10 components)
• Gas CHP engines in commercial horticultural usage with no auxilliary load (2)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED JAN BEZEMER & SONS LIMITED New Build Generating CMU Cleveland Nurseries CHP Cleveland Nurseries Gas Engines +2 more TS9
Active • 2027-28 (T-4), 2025-26 (T-4) ...
12.34 MW
46 Station Road Stokesley Middlesbrough TS9 7AA (10 components) Geocoding Needed
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
• Gas CHP engines in commercial horticultural usage with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
19.89 MW
47-53 Charterhouse Street, London, EC1M 6PB (15 components) Geocoding Needed
• A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
• A site with two reciprocating gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
CHP and autogeneration Combined Heat and Power (CHP) CITIGEN (LONDON) LIMITED Existing Generating CMU Citigen Citigen +7 more EC1M
Active • 2028-29 (T-4), 2027-28 (T-4) ...
65.59 MW
4 FULLARTON DRIVE, GLASGOW EAST INVESTMENT PARK, GLASGOW, G32 8FA (2 components) Geocoding Needed

New CHP engine to be installed at 4 FULLARTON DRIVE, GLASGOW EAST INVESTMENT PARK, GLASGOW, G32 8FA

Combined Heat and Power (CHP) FLEXITRICITY LIMITED New Build Generating CMU FLEX142 G32
Active • 2025-26 (T-4), 2022-23 (T-1)
1.86 MW
5 Coulman St, Thorne, Doncaster DN8 5JT (2 components) Geocoding Needed
• On-Site Generating CMU
• new build on site generating CMU
Combined Heat and Power (CHP) GRIDBEYOND LIMITED New Build Generating CMU On-Site Energy - Chesterfield Poultry DN8
Active • 2027-28 (T-4), 2025-26 (T-4)
1.37 MW
96 Kings Rd, Immingham DN40 1QS (2 components) Geocoding Needed
• Existing Generating CHP
• New-Build CHP Generating Unit at Knauf (UK) Immingham Plant.
Combined Heat and Power (CHP) GRIDBEYOND LIMITED New Build Generating CMU GB2502 DN40
Active • 2028-29 (T-4), 2025-26 (T-4)
3.23 MW
9 Handyside St, Kings Cross, London N1C 4BH (11 components) Geocoding Needed

Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.

Active • 2027-28 (T-4), 2025-26 (T-4) ...
10.44 MW
Academy CHP, Lodge Avenue, Academy Way, Dagenham, London, RM8 2JA (9 components) Geocoding Needed
• A as engine CHP site providing hot water to a local district heating network
• A gas engine CHP site providing hot water to a local district heating network
Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Aggregated CE_Aggregated +4 more RM8
Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.43 MW
Address: Port of Liverpool CHP, Regent Road, Bootle, Liverpool, L20 1ED (10 components) Geocoding Needed

Gas fired CHP

Active • 2025-26 (T-4), 2024-25 (T-4) ...
112.83 MW
Adlington Works, Market Street, Adlington, Lancashire, PR7 4HJ (3 components) Geocoding Needed

CHP with 1.280 rated capacity

Active • 2028-29 (T-4), 2025-26 (T-4) ...
2.66 MW
APS Growers Ltd / Branfield Nursery, 111 Stockbridge Road, Elloughton, HU15 1HW (13 components) Geocoding Needed
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
• The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a thermal output of 3.984 MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
17.59 MW
Ashgrove Road West, Aberdeen AB16 5UL (13 components) Geocoding Needed
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas.
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.14 MW
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (28 components) Geocoding Needed
• !MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
Active • 2028-29 (T-4), 2027-28 (T-4) ...
19.70 MW
Aventine Way, Glebe Farm Industrial Estate, Rugby, CV21 1HA (14 components) Geocoding Needed

A gas CHP supplying a manufacturing facility

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU BVC_CHP BVC_CHP +2 more CV21
Active • 2027-28 (T-4), 2025-26 (T-4) ...
11.94 MW
Bar Ln, Boroughbridge, Roecliffe, York YO51 9NN (4 components) Geocoding Needed

on site generating CMU

Active • 2027-28 (T-4), 2025-26 (T-4) ...
5.85 MW
Barnsley Facilities Services Limited, Estates & Facilities Department, Gawber Road, Barnsley, S75 2EP (12 components) Geocoding Needed
• 1 MW CHP generation
• 1.000 MW CHP generation
• 1.1MW Diesel CHP
Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.84 MW
Loading map...