Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

24 unique locations (156 components)

Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
Wicks Farm, Ford Lane, Arundel, W. Sussex, BN18 0DF (2 components)

New-Build CHP Generating Unit at Berry Wicks Farm.

Active • 2028-29 (T-4), 2025-26 (T-4)
1.26 MW
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (11 components)

Warrington Existing Site CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.64 MW
The Ridgeway, Enfield, Middlesex, EN2 8JL (10 components)
• On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980
• On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980
Active • 2027-28 (T-4), 2026-27 (T-4) ...
5.74 MW
Telford Dairy Limited, Donnington Wood Business Park, Telford, Shropshire, TF2 7GJ (4 components)

On-Site Generating CMU

Active • 2028-29 (T-4), 2025-26 (T-4) ...
7.37 MW
Syensqo Oldbury, Trinity St, Oldbury, B69 4LN (1 component)

Existing Generation on existing site - CHP

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU GBD048 / GB2548 B69
Active • 2025-26 (T-4)
Staithes Road, Preston, Hull, HU12 8TB (17 components)
• CHP Unit Located at Staithes Road, Preston, Hull, HU12 8TB
• Gas fired CHP unit
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.11 MW
Staithes Road, Preston, East Riding of Yorkshire HU12 8TB (2 components)

On-Site Generating CMU.

Active • 2025-26 (T-4), 2025-26 (T-1)
1.97 MW
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (10 components)

Existing Generation on existing site - CHP

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected WV15
Active • 2027-28 (T-4), 2026-27 (T-4) ...
22.71 MW
Sapphire Mill, Glenwood Rd, Leslie, Glenrothes KY6 3AB (1 component)

Existing Generating CMU/

Active • 2025-26 (T-4)
Samworth Brothers, 81-83 Tavistock Road, Callington, Cornwall, PL17 7TA (11 components)

Callington - Existing Site CHP unit

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.74 MW
Repton Rd (Adjacent to Plastic Omnium Site), Measham DE12 7DT (2 components)

On-Site Generating CMU.

Active • 2025-26 (T-4), 2025-26 (T-1)
1.89 MW
Poole Sustainable Energy LTD, Sterte Ave, Poole, Dorset, BH15 2AS (11 components)

Poole Existing Site CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.62 MW
Pond Street, London, NW3 2QG (10 components)
• On-site CHP - existing generating unit Pond Street London OS Grid Reference: TQ 272 854 NW3 2QG
• On-site CHP - existing generating unit Pond Street London OS Grid Reference: TQ 272 854 NW3 2QG
Active • 2027-28 (T-4), 2026-27 (T-4) ...
11.84 MW
Muller UK Limited, Tern Valley Business Park, Market Drayton, Shropshire, TF9 3SQ (4 components)

On-Site Generating CMU

Active • 2028-29 (T-4), 2025-26 (T-4) ...
15.85 MW
Muller Milk & Ingredients Ltd, Stonebridge Cross, Hampton Lovett, Droitwich, WR9 0NX (4 components)

On-Site Generating CMU

Active • 2028-29 (T-4), 2025-26 (T-4) ...
16.10 MW
Muller Milk and Ingredients Market Way, North Petherton, Bridgwater, TA6 6DF (4 components)

On-Site Generating CMU

Active • 2028-29 (T-4), 2025-26 (T-4) ...
11.15 MW
MGH Property Services Limited, Laurels Farm, Hatherton, Nantwich, CW5 7PW (11 components)

Nantwich Existing Site CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.60 MW
Maesgwyn Farm, Chirk, Wrexham, LL14 5NT (15 components)
• On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
• On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU GridBeyond GBD009 LL14
Active • 2028-29 (T-4), 2027-28 (T-4) ...
155.01 MW
Lake Rd, Trafford Park, Stretford, Manchester M17 1TU, United Kingdom (4 components)

On-Site Generating CMU

Active • 2028-29 (T-4), 2025-26 (T-4) ...
9.81 MW
Hams Hall Sustainable Energy LTD, Edison Road, Hams Hall Distribution Park, Coleshill, B46 1AL (11 components)

Hamms Hall - Existing Site CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.57 MW
Clough Green, Cawthorne, Barnsley, S75 4AD (3 components)

On-site Generating CMU.

Active • 2025-26 (T-4), 2024-25 (T-1)
2.69 MW
Bar Ln, Boroughbridge, Roecliffe, York YO51 9NN (4 components)

on site generating CMU

Active • 2027-28 (T-4), 2025-26 (T-4) ...
5.85 MW
96 Kings Rd, Immingham DN40 1QS (2 components)
• Existing Generating CHP
• New-Build CHP Generating Unit at Knauf (UK) Immingham Plant.
Combined Heat and Power (CHP) GRIDBEYOND LIMITED New Build Generating CMU GB2502 DN40
Active • 2028-29 (T-4), 2025-26 (T-4)
3.23 MW
5 Coulman St, Thorne, Doncaster DN8 5JT (2 components)
• On-Site Generating CMU
• new build on site generating CMU
Combined Heat and Power (CHP) GRIDBEYOND LIMITED New Build Generating CMU On-Site Energy - Chesterfield Poultry DN8
Active • 2027-28 (T-4), 2025-26 (T-4)
1.37 MW
Loading map...
Showing 24 locations