Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

12 unique locations (74 components)

Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (9 components)
• District heating implementation of two gas CHP engines with no auxilliary load
• Two 3.0 MW gas CHP engines. Primary fuel type = Natural Gas
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX05 FLEX05 +1 more MK9
Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.48 MW
46 Station Road Stokesley Middlesbrough TS9 7AA (10 components)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
• Gas CHP engines in commercial horticultural usage with no auxilliary load
Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED JAN BEZEMER & SONS LIMITED New Build Generating CMU Cleveland Nurseries CHP Cleveland Nurseries Gas Engines +2 more TS9
Active • 2027-28 (T-4), 2025-26 (T-4) ...
12.34 MW
46 Station Road Stokesley Middlesbrough TS9 7AA (10 components)
• Gas CHP engines in commercial horticultural usage with no auxilliary load (2)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
Active • 2027-28 (T-4), 2025-26 (T-4) ...
12.34 MW
4 FULLARTON DRIVE, GLASGOW EAST INVESTMENT PARK, GLASGOW, G32 8FA (2 components)

New CHP engine to be installed at 4 FULLARTON DRIVE, GLASGOW EAST INVESTMENT PARK, GLASGOW, G32 8FA

Combined Heat and Power (CHP) FLEXITRICITY LIMITED New Build Generating CMU FLEX142 G32
Active • 2025-26 (T-4), 2022-23 (T-1)
9 Handyside St, Kings Cross, London N1C 4BH (12 components)

Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.

Active • 2027-28 (T-4), 2026-27 (T-1) ...
7.00 MW
Dalmarnock, 120 Cotton Street, Glasgow, G40 4HU (3 components)

CHP at a water treatment works in Glasgow.

Combined Heat and Power (CHP) FLEXITRICITY LIMITED New Build Generating CMU FLEX147 FLEX147 G40
Active • 2025-26 (T-4), 2024-25 (T-1) ...
0.92 MW
HALEWOOD PLANT, SPEKE BOULEVARD, LIVERPOOL, L24 9LE (2 components)

CHP engines to be installed at: HALEWOOD PLANT, SPEKE BOULEVARD, LIVERPOOL, L24 9LE

Combined Heat and Power (CHP) FLEXITRICITY LIMITED New Build Generating CMU FLEX140 L24
Active • 2025-26 (T-4), 2022-23 (T-1)
HUMBERSTONE ROAD, GRIMSBY, DN32 8HW (2 components)

CHP engines to be installed at HUMBERSTONE ROAD, GRIMSBY, DN32 8HW

Combined Heat and Power (CHP) FLEXITRICITY LIMITED New Build Generating CMU FLEX142 DN32
Active • 2025-26 (T-4), 2022-23 (T-1)
LADYSMITH ROAD, GRIMSBY, DN32 9EE (2 components)

CHP engines to be installed at existing site at LADYSMITH ROAD, GRIMSBY, DN32 9EE

Combined Heat and Power (CHP) FLEXITRICITY LIMITED New Build Generating CMU FLEX141 DN32
Active • 2025-26 (T-4), 2022-23 (T-1)
Runcton Nursery, Lagness Road, Chichester PO20 1LJ (11 components)

Two gas CHP in a horticultural environment with no aux load (3)

Active • 2029-30 (T-4), 2026-27 (T-1) ...
6.50 MW
Thearne Lane Woodmansey Beverley HU17 0SA (7 components)
• Two gas CHP engines in commercial horticultural environment with no auxilliary load (2)
• Gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.05 MW
Thearne Lane, Woodmansey, Beverley, North Humberside, HU17 0SA (4 components)

2 x CHP at a horticultural site (3)

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX167 HU17
Active • 2028-29 (T-4), 2026-27 (T-1) ...
4.68 MW
Loading map...
Showing 12 locations