Young's House, Wickham Road, Grimsby DN32 8HW (4 components)
• On-site Generating CMU (2)
• on site generating CMU
Active • 2028-29 (T-4), 2025-26 (T-1) ...
8.22 MW
Wicks Farm, Ford Lane, Arundel, W. Sussex, BN18 0DF (3 components)

New-Build CHP Generating Unit at Berry Wicks Farm. (2)

Active • 2028-29 (T-4), 2026-27 (T-1) ...
2.51 MW
Westexe, Tiverton, Devon, EX16 5LL (6 components)

2026 kW CHP unit (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.65 MW
Valley Park Industrial Estate, Meadow Gate, Wombwell, Barnsley, S73 0UN (1 component)

Generating unit

Active • 2025-26 (T-4)
University of Warwick, Coventry, CV4 7AL (48 components)
• One of six CHP units at University of Warwick, Coventry, CV4 7AL (2)
• One of six CHP units at University of Warwick, Coventry, CV4 7AL.
Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GC2426 GCMU18 +4 more CV4
Active • 2025-26 (T-4), 2024-25 (T-4) ...
University of East Anglia, Norwich Research Park, Norwich NR4 7TJ (8 components)

Behind the Meter CHP Unit

Active • 2025-26 (T-1), 2024-25 (T-1) ...
10.90 MW
Unit 3016, Hereford Street, Bolton, BL1 8HU (6 components)

E1000 CHP (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.79 MW
1.79 MW
Unit 2898, Tuscany Park, Wakefield, WF6 2TZ (6 components)

EnerG 1000 CHP (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.82 MW
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (9 components)
• Gas fired CHP unit (2)
• Gas CHP in St. Austell
Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG55 PL26
Active • 2026-27 (T-4), 2025-26 (T-4) ...
6.12 MW
TOTAL LINDSEY OIL REFINERY LTD, EASTFIELD ROAD, NORTH KILLINGHOLME, IMMINGHAM, DN40 3LW (6 components)
• On-Site Generating CMU. (2)
• On-Site Generating Steam Turbine, utilising heat recovery waste as a 'fuel input' and generating electricity w/o fossil fuel emissions.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
79.47 MW
T&L Sugars Limited, Thames Refinery, Factory Road, Silvertown, London, United Kingdom, E16 2EW (20 components)
• No2 Steam turbine - Allen Steam Turbines/NG Model MB510 - 2009 - Nominal power rating 14500kWe (2)
• No5 Gas Turbine - European Gas Turbines SGT200 'Tornado' - S765/01 1997 - Nominal power output 6000kWe
Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU XGEN24 XGEN24 +6 more E16
Active • 2025-26 (T-4), 2023-24 (T-4) ...
13.16 MW
Thirsk Factory, Dalton Airfield, Topcliffe, Thirsk, YO7 3HE. (5 components)

1.280MW CHP (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
2.34 MW
The Heat Station, Harbour Parade, Southampton, Hampshire, SO15 1BA (24 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
9.91 MW
The Christie Hospital, Wilmslow Road, Manchester, M20 4BX (1 component)

VIT43A - CHP unit at The Christie Hospital, Wilmslow Road, Manchester, M20 4BX

Active • 2025-26 (T-4)
Thearne Lane, Woodmansey, Beverley, North Humberside, HU17 0SA (4 components)

2 x CHP at a horticultural site (3)

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX167 HU17
Active • 2028-29 (T-4), 2026-27 (T-1) ...
4.68 MW
Taw Valley Creamery, South Weeke, North Tawton, Devon, England, EX20 2DA (4 components)

CHP unit (3)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENZ02 GENZ02 +1 more EX20
Active • 2025-26 (T-4), 2024-25 (T-4) ...
1.76 MW
Syensqo Oldbury, Trinity St, Oldbury, B69 4LN (3 components)

Existing Generation on existing site - CHP

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU GBD048 / GB2548 B69
Active • 2029-30 (T-4), 2026-27 (T-1) ...
2.24 MW
Staverton, Trowbridge, BA14 6PG (1 component)

Turbomach M50 Natural Gas fired CHP unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU07 BA14
Active • 2025-26 (T-1)
4.47 MW
Station Road, Wigton, Cumbria CA7 9BG (20 components)
• Gas engine (2)
• Gas turbine
CHP and autogeneration Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU16 GCMU16 +10 more CA7
Active • 2025-26 (T-4), 2024-25 (T-4) ...
19.23 MW
Staithes Road, Preston, East Riding of Yorkshire HU12 8TB (4 components)

On-Site Generating CMU.

Active • 2029-30 (T-4), 2026-27 (T-1) ...
5.89 MW
Speke Blvd, Speke, Liverpool L24 9LE (3 components)
• on site generating CMU (2)
• On-site Generating CMU
Active • 2025-26 (T-1), 2024-25 (T-1) ...
9.61 MW
Solenis, Cleckheaton Road, Low Moor, Bradford, United Kingdom, BD12 0JZ (11 components)

Gas Turbine CHP unit (3)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENX42 GENX42 +2 more BD12
Active • 2025-26 (T-4), 2024-25 (T-1) ...
10.17 MW
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham, B7 5RE (13 components)
• 1 x 3.5MW natural gas fired turbine + 1 x 4.8MW natural gas fired turbine
• 8.300MW Gas Turbine installation
• 8.3MW Gas Turbine installation
Active • 2027-28 (T-4), 2026-27 (T-4) ...